Supercomputers/Systems/Nebius Vineland (Microsoft)
USA · operational · ai training
Nebius Vineland (Microsoft)
Deep dive: How Nebius and Nscale build GPU clouds
Also known as Nebius New Jersey AI data center
Operated by Nebius at Nebius Vineland Data Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Nebius supplies dedicated GPU capacity clusters to Microsoft from the Vineland build-to-suit data center under a five-year agreement | Nebius | - | Reported | sec.gov |
Engineering, funding and access
What Nebius Vineland (Microsoft) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Nebius, financing capex from cash flows under the Microsoft agreement and debt issued against the contract | 2025-09 | Regulatory filing | sec.govrcrwireless.com |
| Procurement | Five-year agreement with Microsoft signed 8 September 2025 worth about $17.4 billion through 2031 (up to $19.4 billion with extra services), delivered in tranches during 2025 and 2026 | 2025-09 | Regulatory filing | sec.govrcrwireless.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Dedicated GPU infrastructure capacity in clusters supplied to Microsoft; not offered as general cloud capacity in these filings | 2025-09 | Regulatory filing | sec.govrcrwireless.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Facility power | 300 MW | 2025-03-05 | Design target | Nebius: new New Jersey data center with capacity of up to 300 MW, phased; 100 MW installed targeted by end 2025. IT vs total not stated. Site-level. | nebius.com |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Other | - | - | planned | 2025-03 | Operator stated | Nebius says the New Jersey site (expandable to 300 MW) uses behind-the-meter electricity and advanced energy technology; generation type not disclosed. | nebius.com |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
Compute deals
All compute deals. Headline values are as announced, not additive.
The read
The new build-to-suit data center in Vineland, New Jersey from which Nebius supplies dedicated GPU capacity to Microsoft under a five-year agreement of about 17.4 billion dollars through 2031 (up to 19.4 billion with extra services), signed 8 September 2025 with deployment in tranches during 2025 and 2026 per Nebius's SEC filing. Trade coverage of the announcement gives 300 MW initial capacity with potential for another 400 MW. Nebius's 12 February 2026 shareholder letter states the first tranche of capacity was delivered to Microsoft on time in November 2025; the letter does not name the site, so the link to Vineland rests on the SEC filing tying the Microsoft contract to Vineland. No page states a GPU model or count, so no accelerator edge is recorded. The tier is reported. It has never submitted an HPL result.
Site & facility
Change history
- 2026-10-02 Added Nebius Vineland (Microsoft) (Nebius)
Related systems
Same operator
- ISEG2 · Netherlands, operational, 2025
- Nebius Iceland Cluster · Iceland, operational
- Nebius Kansas City Cluster · USA, operational, 2025
- Nebius Longcross UK Cluster · United Kingdom, operational, 2025
- Nebius Modiin Cluster · Israel, operational, 2025
- Nebius Béthune AI Factory · France, under construction
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| rcrwireless.com | names system only | - |
| sec.gov | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.