Supercomputers/Systems/Numerical Wind Tunnel
Japan · decommissioned · hpc
Numerical Wind Tunnel
Also known as NWT
Operated by National Aerospace Laboratory of Japan at National Aerospace Laboratory, Chofu .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 124.0 GFlop/s
- Rpeak
- 235.8 GFlop/s
- Rmax ÷ Rpeak
- 52.6%
- Cores
- 140
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Fujitsu | Fujitsu | - | Verified | museum.ipsj.or.jpnetlib.org |
| CPU | Fujitsu VPP500 vector processing element CPUs Fujitsu vector · 1C · 0.105 GHz · GaAs Fujitsu VPP500 vector processor | Fujitsu | 140 reported | Verified | netlib.orgmuseum.ipsj.or.jp |
| Interconnect | Fujitsu VPP500 crossbar Interconnect Full crossbar · 400 MB/s per direction VPP500 crossbar | Fujitsu | - | Reported | netlib.orgmuseum.ipsj.or.jp |
| Cooling | Conduction-cooled liquid (primary/secondary loop) Cooling Sealed primary loop at the package, secondary loop rejecting outdoors Primary/secondary liquid cooling loop | Fujitsu | - | Verified | museum.ipsj.or.jpnetlib.org |
| Operating system | Fujitsu UXP Operating systems Unix (SVR4-derived), Fujitsu-customised · Proprietary CP/PE operating system UXP (based on UNIX SVR4) | Fujitsu | - | Reported | museum.ipsj.or.jp |
The read
The machine that held the top of the list from November 1993 into 1995, and the reason the early graph is not simply an American story. NAL and Fujitsu co-designed it, so the supplier relationship runs in both directions: the VPP500 that Fujitsu later sold commercially was built on technology developed for this one customer. Its processors are gallium arsenide rather than CMOS, which is the clearest marker of how differently the performance problem was solved before density took over. NAL itself no longer exists: it merged into JAXA in October 2003, which makes it the earliest case in the dataset where the operator, not the vendor, is the entity that had to be resolved.
Timeline
- 1993-01 First operational source
- 1993-11 List debut at #1 (November 1993) source
- 2002 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
National Aerospace Laboratory, Chofu
- Location
- Chofu, Japan
- Commissioned
- 1993
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| museum.ipsj.or.jp | names system and part | Fujitsu VPP500 vector processing element, Fujitsu VPP500 crossbar |
| netlib.org | names system, part and count | Fujitsu VPP500 vector processing element, Fujitsu VPP500 crossbar · counts: 140 |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.