COMPUTE ATLAS Supercomputer supply-chain graph
1345 systems 511 sites Sourced data

Supercomputers/Systems/Genius (KU Leuven)

Belgium · decommissioned · hpc

Genius (KU Leuven)

Also known as KU Leuven Genius; VSC Genius Tier-2

Operated by KU Leuven .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA Tesla P100
Accelerators
CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W
NVIDIA P100 SXM2 GPUs, 24 devices in 6 nodes
NVIDIA 24
reported
Reported docs.vscentrum.be
CPU -
Intel Xeon Gold 6140 Skylake and Xeon Gold 6240 Cascade Lake thin nodes, 230 nodes
Intel 230
reported
Reported docs.vscentrum.be
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
InfiniBand EDR network
NVIDIA - Reported docs.vscentrum.be

The read

A KU Leuven/UHasselt Tier-2 cluster of the Flemish Supercomputer Centre. The VSC hardware page records production from 2018 to the end of September 2026 and lists 230 thin nodes (86 Skylake Xeon Gold 6140, 144 Cascade Lake Xeon Gold 6240 and 4 AMD EPYC 7501 nodes), 10 big-memory nodes with 768 GiB, one Superdome node with 8 Xeon Gold 6132 CPUs and 6 TiB, and 6 GPU nodes with 24 NVIDIA P100 SXM2 GPUs linked by NVLink, all on InfiniBand EDR; the GPU resources moved to wICE after the decommissioning. An earlier version of the page described more GPU nodes. No whole-system FLOPS or core total is published, so none is recorded. Operator documentation only, so the tier is reported.

Timeline

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.vscentrum.benames system, part and countMellanox InfiniBand EDR · counts: 24

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.

Further reading