Supercomputers/Systems/CRESCO8

Italy · operational · hpc

CRESCO8

Also known as ENEA CRESCO8

Operated by ENEA at ENEA Portici Research Centre .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.43 PFlop/s
HPL measured
Rpeak
5.91 PFlop/s
Rmax ÷ Rpeak
91.9%
Cores
97,280
Power
805 kW
Per watt
6.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of CRESCO8, and those in Italy. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax5.43 PFlop/s#150 of 202 · bottom 27%#11 of 21 · top 50%
Energy efficiency6.7 GF/W#85 of 99 · bottom 15%#8 of 14 · bottom 47%
Rmax ÷ Rpeak91.9 %#10 of 199 · top 5%#1 of 20 · highest
Power draw805 kW#48 of 104 · top 46%#11 of 14 · bottom 24%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo ThinkSystem SD650 V3 Neptune
Lenovo - Verified top500.orgmedia.enea.it
CPU -
Intel Xeon Platinum 8592+ 64C 1.9GHz, two per node on 758 nodes
Intel - Verified top500.orgmedia.enea.it
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
Infiniband NDR
NVIDIA - Reported top500.org
Cooling -
Lenovo Neptune water cooling capturing up to 98 percent of heat
Lenovo - Reported media.enea.it
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
RHEL 9.4
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.org

Engineering, funding and access

What CRESCO8 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes758 nodesENEA's inauguration release describes 758 Lenovo ThinkSystem SD650 V3 Neptune nodes with two Intel Xeon Platinum 8592 CPUs each.2025-04Operator statedmedia.enea.it
Interconnect and topologyInfiniBand NDRAs submitted to the TOP500 list.2026-06Operator statedtop500.org
Cooling designLenovo Neptune direct water cooling, stated to capture up to 98% of the system heat and cut cooling energy by up to 40%Figures are from the ENEA press release describing the Lenovo Neptune design.2025-04Vendor statedmedia.enea.it

Software

ItemDetailAs ofBasisSource
Programming and software stackRHEL 9.4 operating systemTOP500 submission.2026-06Operator statedtop500.org
Programming and software stackIntel oneAPI 2023.2 compiler, Intel MKL 2023.2 and Intel MPI 2021.10Toolchain used for the HPL run submitted to TOP500.2026-06Operator statedtop500.org

Access

ItemDetailAs ofBasisSource
How researchers get timeOpen to universities, research bodies and companies for projects that need HPCENEA does not describe an application procedure in the release.2025-04Operator statedmedia.enea.it
Access pagewww.eneagrid.enea.it/CRESCOportalENEAGRID portal with OpenOnDemand web access and an account request form; it does not describe a project allocation process.2026-10Operator statedeneagrid.enea.it

The read

ENEA's Tier-0 CPU cluster at the Portici Research Centre near Naples, inaugurated on 9 April 2025 and aimed at energy transition and nuclear fusion research. TOP500 lists a Lenovo ThinkSystem SD650 V3 with Intel Xeon Platinum 8592+ 64-core 1.9 GHz processors and InfiniBand NDR under RHEL 9.4: 97,280 cores, Rmax 5.43 PFlop/s, Rpeak 5.91 PFlop/s and 805 kW. The ENEA press release describes 758 nodes with two Xeon Platinum 8592 processors each in a Lenovo Neptune direct water-cooled system that captures up to 98 percent of the heat, housed in a dedicated facility of about 150 square metres; it quotes over 9 PFlops of computational power, which does not match the TOP500 Rpeak and is not recorded as a FLOPS figure. TOP500 ranks: 228th (June 2025), 259th (November 2025), 284th (June 2026).

Timeline

  • 2025-04 First operational source
  • 2025-06 Listed at #228 on the TOP500 (June 2025) source
  • 2025-06 Entered the TOP500 list at rank 228 at ISC 2025 source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

ENEA Portici Research Centre

Location
Portici (Naples), Italy

Change history

Nearby in scale

The machines closest to CRESCO8 by Rmax, smaller to larger.

Same site

  • CRESCO7 · Italy, operational, 2023
  • CRESCO6 · Italy, operational, 2018

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA InfiniBand NDR (Quantum-2)
media.enea.itnames system only-