Supercomputers/Systems/KT Cloud Cheongna AI Data Center

South Korea · planned · ai training

KT Cloud Cheongna AI Data Center

Also known as KT Cloud Incheon Cheongna data center

Operated by KT Cloud at KT Cloud Cheongna Site (Incheon) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
KT Cloud is design, build and operate partner for the 50 MW Cheongna data center
KT Cloud
rolls up to KT Corporation
- Reported baxtel.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 50 MW 2026-10 Design target KT Cloud: 50 MW data center, construction from Q4 2026 to Q1 2030 baxtel.com

The read

KT Cloud's 50 MW data center in the Cheongna district of Incheon: two basement levels and 11 floors, with a dedicated AI zone using direct-to-chip liquid cooling. Construction is due to start in Q4 2026 and complete in Q1 2030, with Hyundai Engineering as joint contractor. KT Cloud is design, build and operate partner and plans to link it to its regional centers; Baxtel adds that KT Cloud now targets 1 GW of capacity by 2031, up from 320 MW by 2030, and lists existing sites of 10, 26 and 30 MW. No GPU vendor or count is stated.

Timeline

Site & facility

KT Cloud Cheongna Site (Incheon)

Location
Incheon, South Korea
Cooling
Direct-to-chip liquid cooling (AI zone)