COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Wilkes-2

United Kingdom · decommissioned · hpc

Wilkes-2

Operated by University of Cambridge at University of Cambridge (CSD3) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.19 PFlop/s
HPL measured
Rpeak
1.75 PFlop/s
Rmax ÷ Rpeak
68.1%
Cores
21,240
Power
114.4 kW
Per watt
10.4 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Wilkes-2, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.19 PFlop/s#141 of 234 · bottom 41%#22 of 44 · top 49%
Energy efficiency10.4 GF/W#17 of 158 · top 10%#7 of 21 · top 30%
Rmax ÷ Rpeak68.1 %#129 of 229 · bottom 45%#30 of 44 · bottom 34%
Power draw114 kW#143 of 161 · bottom 12%#19 of 21 · bottom 11%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell C4130
Dell Technologies - Verified top500.orgprnewswire.com
Accelerator NVIDIA Tesla P100
Accelerators
CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W
NVIDIA Tesla P100
NVIDIA - Reported top500.org
CPU Intel Xeon E5-2650 v4
CPUs
x86-64 · 12C · 2.2 GHz · 14 nm
Xeon E5-2650v4 12C 2.2GHz
Intel - Reported top500.org
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
Infiniband EDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org

Engineering, funding and access

What Wilkes-2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes90 nodesDell PowerEdge C4130 nodes, each with one Xeon E5-2650 v4 (12 cores) and four NVIDIA Tesla P100-PCIE-16GB, 360 GPUs in total2019-10Operator statedhelp.uis.cam.ac.uk
Interconnect and topologyMellanox EDR InfiniBand, 100 Gbit/s2019-10Operator statedhelp.uis.cam.ac.uktop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackHPL run on Scientific Linux with GNU and NVCC compilers, Intel MKL 11.3.3.210 and OpenMPI 1.10.2TOP500 list entry2017-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funded byUniversity of Cambridge, co-investor in the 9 million pound CSD3 service that included Wilkes22019-10Operator statedhelp.uis.cam.ac.uk
Funded byScience and Technology Facilities Council (STFC), co-investor in the 9 million pound CSD3 service that included Wilkes22019-10Operator statedhelp.uis.cam.ac.uk
Funded byEngineering and Physical Sciences Research Council (EPSRC), co-investor in the 9 million pound CSD3 service that included Wilkes22019-10Operator statedhelp.uis.cam.ac.uk
Funding programmeEPSRC Tier 2 National HPC Service (CSD3)CSD3 went live in November 2017; the 2019 slides list Wilkes2 as its P100 GPU platform2026Operator stateddocs.hpc.cam.ac.ukhelp.uis.cam.ac.uk
ProcurementCo-designed with Dell EMC, Intel and NVIDIA as part of CSD3; Dell EMC called the new Cambridge Research Computing Service system, including Wilkes-2, a USD 12M system in June 2017The University slides give a 9 million pound co-investment for CSD32017-06-20Vendor statedprnewswire.comhelp.uis.cam.ac.uk

The read

Cambridge's GPU successor to the original 2013 Wilkes cluster: Dell C4130 nodes, each two Xeon E5-2650v4 CPUs plus NVIDIA Tesla P100 accelerators, on InfiniBand EDR. Dell EMC's own ISC 2017 announcement independently confirms TOP500's ranking context, describing it as the largest GPU system in the UK, part of a $12M investment, ranked 100th on that TOP500 list and 5th on Green500; both TOP500's June 2017 Green500 list and Dell EMC's release independently agree on the 5th-place Green500 rank. Exact Rmax, Rpeak and core count rest on TOP500 alone, so the tier is reported. Cambridge's user guide (https://docs.hpc.cam.ac.uk/hpc/user-guide/upgrade2021.html) scheduled Wilkes-2's final retirement for 28 February 2022.

Timeline

  • 2017 Announced source
  • 2017 First operational source
  • 2017-06 Listed at #101 on the TOP500 (June 2017) source
  • 2021-11-10 Half of the Wilkes2 P100 GPU nodes left production service after the A100 Ampere racks entered production source
  • 2022-02-28 Cambridge scheduled the final retirement of the Wilkes2 P100 GPU service for 28 February 2022 source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

University of Cambridge (CSD3)

Location
Cambridge, United Kingdom
Commissioned
2024

Change history

Nearby in scale

The machines closest to Wilkes-2 by Rmax, smaller to larger.

Same site

  • Peta4 · United Kingdom, upgraded, 2017
  • Cumulus Cascade Lake · United Kingdom, operational, 2020
  • Wilkes-3 · United Kingdom, operational, 2021
  • Dawn · United Kingdom, operational, 2024
  • Zenith · United Kingdom, operational, 2026

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA Tesla P100, Intel Xeon E5-2650 v4, Mellanox InfiniBand EDR
prnewswire.comnames system and partIntel Xeon E5-2650 v4

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading