Supercomputers/Systems/Sesterce Marseille SuperComputer

France · operational · ai training

Sesterce Marseille SuperComputer

Operated by Sesterce at Sesterce / Digital Realty Marseille Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Deployed and operated by Sesterce, hosted in Digital Realty's Marseille data center
Sesterce
- Reported intelligentdatacentres.com
Accelerator NVIDIA H100 SXM5
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
NVIDIA H100 Tensor Core GPUs
NVIDIA - Reported intelligentdatacentres.comsolutions-numeriques.com
Interconnect -
InfiniBand (generation not specified by any fetched source)
NVIDIA - Reported intelligentdatacentres.comsolutions-numeriques.com

The read

A French neocloud's NVIDIA H100 cluster hosted in Digital Realty's Marseille data center, announced in late November 2024 as InfiniBand-connected and marketed on renewable-powered, environmentally efficient operation; French trade press reports it followed Sesterce's Paris H200 cluster (on Dell PowerEdge XE9680 nodes) by less than a month. Neither the independent trade coverage found nor Sesterce's own newsroom listing (which no longer surfaces the original announcement page) gives an exact GPU count, interconnect generation, CPU or power figure, so this row carries no FLOPS, rank or accelerator quantity; it has never submitted an HPL result. Sesterce also has a much larger 40,000-GPU campus under construction at Valence, France (targeted for 2026), which is not recorded as its own row because no fetched source names an accelerator vendor or model for that facility yet.

Timeline

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
intelligentdatacentres.comnames system and partNVIDIA H100 SXM5
solutions-numeriques.comnames system and partNVIDIA H100 SXM5

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.