Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 5.05 PFlop/s
- Rpeak
- 7.71 PFlop/s
- Rmax ÷ Rpeak
- 65.5%
- Cores
- 47,616
- Power
- 146.56 kW
- Per watt
- 34.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Athena, and those in Poland. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 5.05 PFlop/s | #107 of 210 · bottom 50% | #6 of 19 · top 28% |
| Energy efficiency | 34.5 GF/W | #16 of 109 · top 14% | #2 of 11 · top 10% |
| Rmax ÷ Rpeak | 65.5 % | #143 of 207 · bottom 32% | #13 of 19 · bottom 34% |
| Power draw | 147 kW | #93 of 112 · bottom 18% | #11 of 11 · bottom 1% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - FormatServer THOR ERG21, 48 dual-socket nodes | Format | - | Reported | top500.org |
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W 384 NVIDIA A100 SXM4 40GB GPUs | NVIDIA | 384 reported | Verified | top500.orgoferta-badawcza.agh.edu.pl |
| CPU | AMD EPYC 7742 (Rome) CPUs x86-64 · 64C · 2.25 GHz · 7 nm · 225 W 48 servers, two AMD EPYC 7742 64C 2.25GHz each | AMD | 96 estimated | Verified | top500.orgoferta-badawcza.agh.edu.pl |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds InfiniBand HDR, 4x200 Gb/s per server | NVIDIA | - | Verified | top500.orgoferta-badawcza.agh.edu.pl |
| Operating system | CentOS Operating systems Linux distribution, RHEL-compatible rebuild · Open source, community-maintained CentOS | The CentOS Project | - | Reported | top500.org |
Engineering, funding and access
What Athena runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 48 nodes48 AMD EPYC servers with 384 NVIDIA A100 GPUs; AGH page last updated 24 June 2026. | 2026-06 | Operator stated | oferta-badawcza.agh.edu.pl |
| Interconnect and topology | InfiniBand HDR, 4 x 200 Gb/s per server | 2026-06 | Operator stated | oferta-badawcza.agh.edu.pl |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Open-source Lustre on dedicated storage servers with NVMe flash | 2026-06 | Operator stated | oferta-badawcza.agh.edu.pl |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | Part of the PLGrid infrastructure operated by ACK Cyfronet AGHAGH gives no funder or cost; officially launched 4 October 2022. | 2022-10 | Operator stated | agh.edu.pl |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Part of the PLGrid infrastructure; users register on the PLGrid Portal to obtain an accountAGH lists access type as external. | 2026-06 | Operator stated | oferta-badawcza.agh.edu.pl |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Ranked 105th on the TOP500 and 9th on the Green500 listsAGH article does not state the list edition. | 2022 | Operator stated | agh.edu.pl |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 384 accelerators | 2026-10 | Operator stated | 384 NVIDIA A100 cards across 48 servers per Cyfronet. | cyfronet.pl |
The read
Cyfronet AGH's Krakow system, 48 dual-socket FormatServer THOR ERG21 nodes paired with 384 NVIDIA A100 40GB GPUs, installed in 2021 and formally inaugurated on 4 October 2022; briefly Poland's fastest machine before Cyfronet's own Helios. AGH's own equipment page, TOP500 and Polish trade outlets (DCD, ITReseller) independently agree on 48 servers and 384 A100s, so the CPU and accelerator edges are verified; TOP500 names Format as manufacturer with no independent statement found, so that edge and all quantitative figures stay reported. AGH's page states 6,144 CPU cores, which conflicts with TOP500's own 47,616 total core count for the same system; TOP500's figure is used here and the conflict is logged rather than resolved. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Core count: 6,144 CPU cores (AGH equipment page) against 47,616 total cores (TOP500). TOP500's figure is used; AGH's 6,144 appears to count only the AMD EPYC CPU cores, not whatever TOP500 aggregates into its own core count.
Change history
- 2026-10-04 Added AI datacenter metrics for athena
- 2026-09-23 Added; a new operator (Cyfronet AGH) and a new integrator (Format) joined the taxonomy, and its core count conflicts with TOP500
Nearby in scale
The machines closest to Athena by Rmax, smaller to larger.
- Cardinal · USA, operational · 5.04 PFlop/s
- CUBOX Cray XD6500 · South Korea, operational · 4.96 PFlop/s
- BioHive-1 · USA, operational · 4.9 PFlop/s
- Tigris (RIT) · USA, operational · 5.08 PFlop/s
- Dhabi Supercomputer · United Arab Emirates, operational · 5.09 PFlop/s
- TX-GAIA · USA, operational · 5.16 PFlop/s
Related systems
Same site
- Ares · Poland, operational, 2021
- Helios · Poland, operational, 2024
- Gaia AI Factory · Poland, planned
- Prometheus · Poland, decommissioned, 2015
- Zeus (Cyfronet) · Poland, operational, 2011
Same accelerator
- ABCI 2.0 · Japan, operational, 2021
- AlphaCentauri · Germany, operational, 2021
- Baskerville · United Kingdom, decommissioned, 2021
- Berzelius · Sweden, operational, 2021
- Earth Simulator 4 · Japan, operational, 2021
- Hortense · Belgium, operational, 2021
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| oferta-badawcza.agh.edu.pl | names system, part and count | AMD EPYC 7742 (Rome), NVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR · counts: 384 |
| top500.org | names system, part and count | AMD EPYC 7742 (Rome), NVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR, CentOS · counts: 96 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.