Supercomputers/Systems/TSUBAME-KFC
Japan · upgraded · hpc
TSUBAME-KFC
Operated by Institute of Science Tokyo at Institute of Science Tokyo, Ookayama .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 125.20 TFlop/s
- Rpeak
- 217.00 TFlop/s
- Rmax ÷ Rpeak
- 57.7%
- Cores
- 480
- Power
- 27.8 kW
- Per watt
- 4.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of TSUBAME-KFC, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 125.20 TFlop/s | #204 of 227 · bottom 11% | #99 of 131 · bottom 26% |
| Energy efficiency | 4.5 GF/W | #2 of 186 · top 1% | #35 of 74 · top 47% |
| Rmax ÷ Rpeak | 57.7 % | #208 of 226 · bottom 9% | #116 of 130 · bottom 12% |
| Power draw | 28 kW | #188 of 188 · bottom 1% | #74 of 74 · bottom 1% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Supermicro 1U 4x GPU SuperServer | Supermicro | - | Reported | ir.supermicro.comtitech.ac.jp |
| Accelerator | NVIDIA Tesla K20X Accelerators CUDA (Kepler GK110) · 2,688C · 0.732 GHz · 28 nm · 235 W 4 NVIDIA Tesla K20X GPUs per node, 40 nodes | NVIDIA | 160 reported | Verified | titech.ac.jptop500.org |
| CPU | Intel Xeon E5-2620 v2 (Ivy Bridge EP) CPUs x86-64 · 6C · 2.1 GHz 2 Intel Xeon E5-2620 v2 (Ivy Bridge EP) per node, 40 nodes | Intel | 80 reported | Verified | titech.ac.jptop500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond FDR InfiniBand | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | titech.ac.jp |
| Cooling | Single-phase immersion Cooling Full submersion in a dielectric bath · 100 kW per tank and above Oil-submersion cooling (Green Revolution Cooling), plus air-cooling with cooling towers | Institute of Science Tokyo | - | Reported | titech.ac.jpinsidehpc.com |
Engineering, funding and access
What TSUBAME-KFC runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 40 nodes1U servers, each with two Xeon E5-2620 v2 CPUs and four Tesla K20X GPUs, in one oil-submersion rack. | 2013-12 | Operator stated | titech.ac.jp |
| Interconnect and topology | FDR InfiniBandThe June 2014 Green500 entry also lists InfiniBand FDR. | 2013-12 | Operator stated | titech.ac.jptop500.org |
| Cooling design | Oil-submersion cooling, with the nodes immersed in circulating oil-based coolant, combined with cooling towersGSIC's FY2023 annual report describes it as immersion and warm-water cooling. | 2013-12 | Operator stated | titech.ac.jp |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | MEXT, through an ultra-green supercomputing project budget request made by GSIC | 2013-12 | Operator stated | titech.ac.jp |
| Funding programme | GSIC ultra-green supercomputing project, with TSUBAME-KFC built as a test-bed for TSUBAME3.0 | 2013-12 | Operator stated | titech.ac.jp |
| Procurement | Built with NEC and NVIDIA as primary partners; Green Revolution Cooling, Supermicro, Intel and Mellanox were involved in joint development | 2013-12 | Operator stated | titech.ac.jp |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2013: first in the big-data division of the November 2013 Green Graph 500 list | 2013-11 | Operator stated | titech.ac.jp |
The read
A 40-node prototype that Tokyo Institute of Technology's GSIC built specifically to test full oil-immersion cooling ahead of TSUBAME3.0, and the first system anywhere to clear 4 GFlops/Watt. It topped the Green500 list in November 2013 and again in June 2014 before GSIC expanded it in place into TSUBAME-KFC/DL, which took second place in November 2015 as a larger machine on the same site. Rmax here is derived from the published efficiency, 4.503 GFlops/Watt, times the published power draw, 27.8 kW, since Tokyo Tech's own release states the ratio and the power but not a standalone Rmax figure; Rpeak is the 217 TFlop/s double-precision peak Tokyo Tech states directly. Tokyo Tech's own announcement and TOP500's independent Green500 list agree on the rank, efficiency and power, so the tier is verified. Operated under the isct company row for continuity with the other TSUBAME rows in this dataset, matching the convention already used for tsubame-3, even though this system predates the 2024 Tokyo Tech and Tokyo Medical and Dental University merger.
Timeline
- 2013 Announced source
- 2013-10 First operational source
- 2013-11 Listed at #1 on the Green500 (November 2013) source
- 2014-06 Topped the Green500 again in June 2014 at 4,389.8 MFlops/W and 34.6 kW source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Institute of Science Tokyo, Ookayama
- Location
- Tokyo, Japan
- Cooling
- Direct liquid cooling
- Commissioned
- 2006
Change history
- 2026-09-24 TSUBAME-KFC added (Tokyo Institute of Technology GSIC, Japan)
Nearby in scale
The machines closest to TSUBAME-KFC by Rmax, smaller to larger.
- Volvo Cars E5-2670 Cluster · Sweden, operational · 0.12 PFlop/s
- Earth Simulator 2 · Japan, decommissioned · 0.12 PFlop/s
- Hokkaido SR16000 · Japan, operational · 0.12 PFlop/s
- Vayu (NCI) · Australia, operational · 0.13 PFlop/s
- Encanto · USA, decommissioned · 0.13 PFlop/s
- Jade (CINES) · France, decommissioned · 0.13 PFlop/s
Related systems
Same site
- TSUBAME2.0 · Japan, upgraded, 2010
- TSUBAME3.0 · Japan, decommissioned, 2017
- TSUBAME1.0 · Japan, decommissioned, 2006
- TSUBAME4.0 · Japan, operational, 2024
Same operator
- PRESTO III · Japan, operational, 2002
Same accelerator
- Blue Waters · USA, decommissioned, 2013
- Fionn · Ireland, decommissioned, 2013
- Hydra (MPCDF) · Germany, decommissioned, 2013
- Lichtenberg I · Germany, decommissioned, 2013
- HPC2 · Italy, operational, 2014
- QB-2 · USA, operational, 2014
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system, part and count | Intel Xeon E5-2620 v2 (Ivy Bridge EP), Mellanox InfiniBand FDR · counts: 80 |
| titech.ac.jp | names system and part | Intel Xeon E5-2620 v2 (Ivy Bridge EP), NVIDIA Tesla K20X, Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Power and cooling
Why air ran out at 20 kW a rack, how warm-water cooling removes the chillers, and what PUE conceals.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.