Supercomputers/Systems/Bluesky
USA · decommissioned · hpc
Bluesky
Also known as NCAR IBM p690
Operated by NCAR .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.16 TFlop/s
- Rpeak
- 6.32 TFlop/s
- Rmax ÷ Rpeak
- 50.0%
- Cores
- 1,216
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Bluesky, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.16 TFlop/s | #26 of 54 · top 47% | #306 of 332 · bottom 9% |
| Rmax ÷ Rpeak | 50.0 % | #48 of 54 · bottom 12% | #313 of 331 · bottom 6% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM p690 (38 frames at delivery) | IBM | - | Reported | top500.orgcisl.ucar.edu |
| CPU | - IBM POWER4 1.3 GHz | IBM | 1,216 reported | Reported | top500.orgcisl.ucar.edu |
| Interconnect | - IBM Colony switch | IBM | - | Reported | top500.orgcisl.ucar.edu |
| Operating system | IBM AIX Operating systems Unix (System V-derived) · Proprietary AIX | IBM | - | Reported | top500.org |
Engineering, funding and access
What Bluesky runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 50 nodesOne 32-processor p690 node per frame after the fall 2003 upgrade; 38 at installation. | 2007-03 | Operator stated | cisl.ucar.edu |
| Total memory | 3.33 TB | 2007-03 | Operator stated | cisl.ucar.edu |
| Storage capacity | 31 TB31 TB of disk after the 2003 upgrade, up from about 21 TB. | 2007-03 | Operator stated | cisl.ucar.edu |
| Interconnect and topology | IBM Colony high-speed interconnect for MPI | 2007-03 | Operator stated | cisl.ucar.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Phase 2 of NCAR's Advanced Research Computing System (ARCS) procurement with IBM, received on 2 October 2002 and powered on two days later | 2002-10 | Operator stated | cisl.ucar.edu |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2003: the 12 frames added in the fall 2003 upgrade supported Community Climate System Model work for IPCC activities | 2003 | Operator stated | cisl.ucar.edu |
The read
NCAR's IBM p690 cluster, commissioned on 31 October 2002 and in service until 5 March 2007. It started as 38 frames of 32 POWER4 1.3 GHz processors (1,216 processors, 6.323 TFlop/s peak) on IBM's Colony interconnect, and was upgraded in fall 2003 to 50 frames, 1,600 processors and 8.32 TFlop/s peak. TOP500 ranked the original configuration tenth on the November 2002 list at 3,164 GFlop/s Rmax, which is the entry recorded here. NCAR's page does not give the physical location, so no site is linked. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
- 2002-10 First operational source
- 2002-11 Listed at #10 on the TOP500 (November 2002) source
- 2007-03-05 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Bluesky, NCAR's IBM p690 cluster, tenth on the November 2002 TOP500
Nearby in scale
The machines closest to Bluesky by Rmax, smaller to larger.
- Mammouth-Ms · Canada, operational · 0 PFlop/s
- Seaborg · USA, decommissioned · 0 PFlop/s
- MPI/IPP Garching IBM p690 · Germany, decommissioned · 0 PFlop/s
- USP JS21 Cluster · Brazil, operational · 0 PFlop/s
- HPCx · United Kingdom, decommissioned · 0 PFlop/s
- NOAA FSL HPTi Xeon Cluster · USA, operational · 0 PFlop/s
Related systems
Same operator
- blueice · USA, decommissioned, 2006
- Antero 2 (NCAR C90) · USA, decommissioned, 1997
- Bluefire · USA, decommissioned, 2008
- NCAR Cray T3D · USA, decommissioned, 1994
- Graywolf (NCAR Cray-3) · USA, decommissioned, 1993
- Littlebear (NCAR CM-5) · USA, decommissioned, 1993
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | does not name this system | - |
| cisl.ucar.edu | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.