Companies/Cipher Mining
New York, NY, USA
Cipher Mining
Bitcoin-mining and HPC hosting developer building the Barber Lake campus near Colorado City, Texas, leased to Fluidstack with a Google backstop.
Systems this company appears in
- Systems
- 2
- Aggregate Rmax
- 0.0 GFlop/s
- Aggregate power
- 0 kW
- First appearance
- 2025-09-25
- Most recent
- 2025-11-03
- Concentration
- -
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 2 | 0.0 GFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| Barber Lake (Fluidstack) USA · | Integrator | Cipher Mining | - | unranked |
| Cipher Black Pearl (AWS) USA · | Integrator | Cipher Mining | - | unranked |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| Cipher Black Pearl (AWS) | under construction | - | 300 |
Figures come from the AI datacenter metrics; blank means none recorded.
Compute deals
| Date | Role | Counterparty | Type | MW | Value ($bn) | Source |
|---|---|---|---|---|---|---|
| 2025-11-03 | Seller | Amazon | Datacenter lease | 300 | 5.5 | sec.gov |
| 2025-09-25 | Seller | Fluidstack | Datacenter lease | 168 | 3 | sec.govsec.gov |
Headline values are as announced and are not additive. See all compute deals.
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| Cipher Barber Lake Campus | Colorado City, TX, USA | - | - |
| Black Pearl Site (Wink TX) | Wink, TX, USA | - | - |