Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.17 PFlop/s
HPL measured
Rpeak
9.60 PFlop/s
Rmax ÷ Rpeak
53.8%
Cores
522,080
Power
4.51 MW
Per watt
1.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C8220 / C8220X
Dell Technologies - Verified datacenterknowledge.comtop500.org
Accelerator Intel Xeon Phi SE10P
Accelerators
x86-64 (Knights Corner) · 61C
Intel Xeon Phi SE10P coprocessors
Intel 6,880
reported
Reported datacenterknowledge.comtop500.org
CPU Intel Xeon E5-2680
CPUs
x86-64 · 8C · 2.7 GHz · 32 nm · 130 W
Xeon E5-2680 8C 2.700GHz, two per node
Intel 12,800
reported
Verified datacenterknowledge.comtop500.org
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
56 Gb/s FDR InfiniBand
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Verified datacenterknowledge.comtop500.org

The read

NSF announced the $27.5 million initial grant for Stampede to the University of Texas at Austin's Texas Advanced Computing Center (TACC) on 22 September 2011; the system, built by Dell on PowerEdge C8220/C8220X nodes with dual Intel Xeon E5-2680 processors and Mellanox FDR InfiniBand, began operating 7 January 2013 and was formally dedicated 28 March 2013. It debuted on the November 2012 TOP500 list at rank 7 with 2.66 PFlop/s (Xeon-only, pre-accelerator), then moved up to its best-ever rank of 6 on the June 2013 list once Intel Xeon Phi SE10P coprocessors were fully deployed, reaching the 5.16811 PFlop/s Rmax and 9.59821 PFlop/s Rpeak recorded here; that is the edition this row's list_appearances pointer targets. NVIDIA GPUs were also present for remote visualization but are not recorded as a compute-accelerator edge. Superseded by Stampede2 (2017) and Stampede3 (2024), both already in this dataset.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Texas Advanced Computing Center

Location
Austin, TX, USA
Cooling
Direct liquid cooling
Commissioned
2007

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partIntel Xeon E5-2680, Intel Xeon Phi SE10P, Mellanox InfiniBand FDR
datacenterknowledge.comnames system, part and countIntel Xeon E5-2680, Intel Xeon Phi SE10P, Mellanox InfiniBand FDR · counts: 6880