Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.17 PFlop/s
HPL measured
Rpeak
9.60 PFlop/s
Rmax ÷ Rpeak
53.8%
Cores
522,080
Power
4.51 MW
Per watt
1.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Stampede, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax5.17 PFlop/s#8 of 227 · top 3%#80 of 332 · top 24%
Energy efficiency1.1 GF/W#97 of 186 · bottom 49%#98 of 162 · bottom 41%
Rmax ÷ Rpeak53.8 %#215 of 226 · bottom 6%#302 of 331 · bottom 10%
Power draw4,510 kW#7 of 188 · top 3%#14 of 171 · top 8%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C8220 / C8220X
Dell Technologies - Verified datacenterknowledge.comtop500.org
Accelerator Intel Xeon Phi SE10P
Accelerators
x86-64 (Knights Corner) · 61C
Intel Xeon Phi SE10P coprocessors
Intel 6,880
reported
Reported datacenterknowledge.comtop500.org
CPU Intel Xeon E5-2680
CPUs
x86-64 · 8C · 2.7 GHz · 32 nm · 130 W
Xeon E5-2680 8C 2.700GHz, two per node
Intel 12,800
reported
Verified datacenterknowledge.comtop500.org
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
56 Gb/s FDR InfiniBand
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Verified datacenterknowledge.comtop500.org

Engineering, funding and access

What Stampede runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes6,400 nodesBase cluster of dual Xeon E5 nodes; 6,880 Xeon Phi coprocessors were still in user evaluation in March 2013.2013-03Press reportdatacenterknowledge.comcampustechnology.com
Total memory270 TBThe 2011 plan quoted 272 TB.2013-03Press reportdatacenterknowledge.com
Storage capacity14 PB2013-03Press reportdatacenterknowledge.comcampustechnology.com
Interconnect and topologyMellanox FDR InfiniBand, 56 Gb/sThe 2013 article names Mellanox InfiniBand; the 2011 announcement specifies FDR 56 Gb/s.2013-03Press reportdatacenterknowledge.comcampustechnology.com

Software

ItemDetailAs ofBasisSource
Parallel filesystemLustre, 14 PB2013-03Press reportdatacenterknowledge.com

Funding

ItemDetailAs ofBasisSource
Funded byNational Science Foundation2011-09Press reportcampustechnology.comdatacenterknowledge.com
Funding programmeNSF eXtreme Digital (XD) program2011-09Press reportcampustechnology.com
Stated cost27.5 USD mInitial NSF funding; the same article says total investment over four years would exceed USD 50 million.2011-09Press reportcampustechnology.com
ProcurementAnnounced Sept 2011; built with Dell (Zeus servers, dual 8-core Xeon E5) and Intel (MIC coprocessors), with 128 NVIDIA GPUs for remote visualization and 16 one-terabyte data analysis nodes plannedPlan as announced in 2011; the 2013 article reports 6,400 nodes and NVIDIA GPUs for remote visualization.2011-09Press reportcampustechnology.com

Access

ItemDetailAs ofBasisSource
How researchers get timeNSF XSEDE allocations for open science institutions in the United States2011-09Press reportcampustechnology.com

The read

NSF announced the $27.5 million initial grant for Stampede to the University of Texas at Austin's Texas Advanced Computing Center (TACC) on 22 September 2011; the system, built by Dell on PowerEdge C8220/C8220X nodes with dual Intel Xeon E5-2680 processors and Mellanox FDR InfiniBand, began operating 7 January 2013 and was formally dedicated 28 March 2013. It debuted on the November 2012 TOP500 list at rank 7 with 2.66 PFlop/s (Xeon-only, pre-accelerator), then moved up to its best-ever rank of 6 on the June 2013 list once Intel Xeon Phi SE10P coprocessors were fully deployed, reaching the 5.16811 PFlop/s Rmax and 9.59821 PFlop/s Rpeak recorded here; that is the edition this row's list_appearances pointer targets. NVIDIA GPUs were also present for remote visualization but are not recorded as a compute-accelerator edge. Superseded by Stampede2 (2017) and Stampede3 (2024), both already in this dataset.

Timeline

  • 2011-09 Announced source
  • 2011-09 NSF committed USD 27.5 million in initial funding for a Dell and Intel Stampede system at TACC planned for 2013 source
  • 2013-01 First operational source
  • 2013-03 6,880 Xeon Phi coprocessors were in user evaluation on the 6,400-node cluster, to add more than seven petaflops of peak source
  • 2013-06 Listed at #6 on the TOP500 (June 2013) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Texas Advanced Computing Center

Location
Austin, TX, USA
Cooling
Direct liquid cooling
Commissioned
2007

Change history

Nearby in scale

The machines closest to Stampede by Rmax, smaller to larger.

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partIntel Xeon E5-2680, Intel Xeon Phi SE10P, Mellanox InfiniBand FDR
datacenterknowledge.comnames system, part and countIntel Xeon E5-2680, Intel Xeon Phi SE10P, Mellanox InfiniBand FDR · counts: 6880

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.