Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 5.17 PFlop/s
- Rpeak
- 9.60 PFlop/s
- Rmax ÷ Rpeak
- 53.8%
- Cores
- 522,080
- Power
- 4.51 MW
- Per watt
- 1.1 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Stampede, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 5.17 PFlop/s | #8 of 227 · top 3% | #80 of 332 · top 24% |
| Energy efficiency | 1.1 GF/W | #97 of 186 · bottom 49% | #98 of 162 · bottom 41% |
| Rmax ÷ Rpeak | 53.8 % | #215 of 226 · bottom 6% | #302 of 331 · bottom 10% |
| Power draw | 4,510 kW | #7 of 188 · top 3% | #14 of 171 · top 8% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge C8220 / C8220X | Dell Technologies | - | Verified | datacenterknowledge.comtop500.org |
| Accelerator | Intel Xeon Phi SE10P Accelerators x86-64 (Knights Corner) · 61C Intel Xeon Phi SE10P coprocessors | Intel | 6,880 reported | Reported | datacenterknowledge.comtop500.org |
| CPU | Intel Xeon E5-2680 CPUs x86-64 · 8C · 2.7 GHz · 32 nm · 130 W Xeon E5-2680 8C 2.700GHz, two per node | Intel | 12,800 reported | Verified | datacenterknowledge.comtop500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond 56 Gb/s FDR InfiniBand | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Verified | datacenterknowledge.comtop500.org |
Engineering, funding and access
What Stampede runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 6,400 nodesBase cluster of dual Xeon E5 nodes; 6,880 Xeon Phi coprocessors were still in user evaluation in March 2013. | 2013-03 | Press report | datacenterknowledge.comcampustechnology.com |
| Total memory | 270 TBThe 2011 plan quoted 272 TB. | 2013-03 | Press report | datacenterknowledge.com |
| Storage capacity | 14 PB | 2013-03 | Press report | datacenterknowledge.comcampustechnology.com |
| Interconnect and topology | Mellanox FDR InfiniBand, 56 Gb/sThe 2013 article names Mellanox InfiniBand; the 2011 announcement specifies FDR 56 Gb/s. | 2013-03 | Press report | datacenterknowledge.comcampustechnology.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre, 14 PB | 2013-03 | Press report | datacenterknowledge.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Science Foundation | 2011-09 | Press report | campustechnology.comdatacenterknowledge.com |
| Funding programme | NSF eXtreme Digital (XD) program | 2011-09 | Press report | campustechnology.com |
| Stated cost | 27.5 USD mInitial NSF funding; the same article says total investment over four years would exceed USD 50 million. | 2011-09 | Press report | campustechnology.com |
| Procurement | Announced Sept 2011; built with Dell (Zeus servers, dual 8-core Xeon E5) and Intel (MIC coprocessors), with 128 NVIDIA GPUs for remote visualization and 16 one-terabyte data analysis nodes plannedPlan as announced in 2011; the 2013 article reports 6,400 nodes and NVIDIA GPUs for remote visualization. | 2011-09 | Press report | campustechnology.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | NSF XSEDE allocations for open science institutions in the United States | 2011-09 | Press report | campustechnology.com |
The read
NSF announced the $27.5 million initial grant for Stampede to the University of Texas at Austin's Texas Advanced Computing Center (TACC) on 22 September 2011; the system, built by Dell on PowerEdge C8220/C8220X nodes with dual Intel Xeon E5-2680 processors and Mellanox FDR InfiniBand, began operating 7 January 2013 and was formally dedicated 28 March 2013. It debuted on the November 2012 TOP500 list at rank 7 with 2.66 PFlop/s (Xeon-only, pre-accelerator), then moved up to its best-ever rank of 6 on the June 2013 list once Intel Xeon Phi SE10P coprocessors were fully deployed, reaching the 5.16811 PFlop/s Rmax and 9.59821 PFlop/s Rpeak recorded here; that is the edition this row's list_appearances pointer targets. NVIDIA GPUs were also present for remote visualization but are not recorded as a compute-accelerator edge. Superseded by Stampede2 (2017) and Stampede3 (2024), both already in this dataset.
Timeline
- 2011-09 Announced source
- 2011-09 NSF committed USD 27.5 million in initial funding for a Dell and Intel Stampede system at TACC planned for 2013 source
- 2013-01 First operational source
- 2013-03 6,880 Xeon Phi coprocessors were in user evaluation on the 6,400-node cluster, to add more than seven petaflops of peak source
- 2013-06 Listed at #6 on the TOP500 (June 2013) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Texas Advanced Computing Center
- Location
- Austin, TX, USA
- Cooling
- Direct liquid cooling
- Commissioned
- 2007
Change history
- 2026-09-24 Stampede added
Nearby in scale
The machines closest to Stampede by Rmax, smaller to larger.
- Nano 4 GB200 · Taiwan, operational · 5.16 PFlop/s
- TX-GAIA · USA, operational · 5.16 PFlop/s
- Dhabi Supercomputer · United Arab Emirates, operational · 5.09 PFlop/s
- Cosmos (SDSC) · USA, operational · 5.18 PFlop/s
- Tursa · United Kingdom, operational · 5.23 PFlop/s
- CLAIX-2023 · Germany, operational · 5.24 PFlop/s
Related systems
Same site
- Maverick (TACC) · USA, operational, 2014
- Lonestar 4 · USA, decommissioned, 2011
- Lonestar 5 · USA, decommissioned, 2016
- Stampede2 · USA, decommissioned, 2017
- Ranger · USA, decommissioned, 2008
- Frontera · USA, decommissioned, 2019
Same operator
- Longhorn · USA, operational, 2019
- Lonestar6 · USA, operational
- Horizon · USA, under construction
- Stampede3 · USA, operational, 2024
- Vista (TACC) · USA, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon E5-2680, Intel Xeon Phi SE10P, Mellanox InfiniBand FDR |
| datacenterknowledge.com | names system, part and count | Intel Xeon E5-2680, Intel Xeon Phi SE10P, Mellanox InfiniBand FDR · counts: 6880 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.