COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Isambard-AI Phase 2

United Kingdom · operational · ai training

Isambard-AI Phase 2

Deep dive: Isambard-AI versus Alps: two GH200 routes

Operated by University of Bristol at National Composites Centre, Bristol .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
216.5 PFlop/s
HPL measured
Rpeak
278.6 PFlop/s
Rmax ÷ Rpeak
77.7%
Cores
1,028,160
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray EX4000
Hewlett Packard Enterprise - Reported top500.org
Accelerator NVIDIA GH200 Grace Hopper Superchip
Accelerators
Arm CPU + CUDA GPU · TSMC 4N
NVIDIA GH200 Superchip
NVIDIA - Verified top500.orgbristol.ac.uk
CPU NVIDIA Grace
CPUs
Armv9 (Neoverse V2) · 72C · 3.1 GHz · TSMC 4N
NVIDIA Grace 72C 3.1GHz
NVIDIA - Verified top500.orgbristol.ac.uk
Interconnect HPE Slingshot-11
Interconnect
Dragonfly · 200 Gb/s per port · Around 2 microseconds
Slingshot-11
Hewlett Packard Enterprise - Reported top500.org
Storage HPE Cray ClusterStor E1000
Storage
Lustre appliance, flash and disk tiers · 700 PB on Frontier (Orion) · About 10 TB/s peak
20 PiB Cray ClusterStor, all solid-state
Hewlett Packard Enterprise - Reported bristol.ac.uk
Storage VAST Data Platform
Storage
Disaggregated shared-everything
3.5 PiB VAST, all solid-state
VAST Data
- Reported bristol.ac.uk
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
Direct Liquid Cooling
Hewlett Packard Enterprise - Reported bristol.ac.uk
Operating system HPE Cray Operating System
Operating systems
SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux
HPE Cray OS
Hewlett Packard Enterprise - Reported top500.org

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 5,280 accelerators 2026-10 Operator stated Phase 2 only: 1,320 nodes x 4 GH200. Bristol says the combined Isambard-AI total is 5,448 superchips. docs.isambard.ac.ukbristol.ac.uk
Facility power 5 MW 2026-10 Operator stated Grid supply at the National Composites Centre site, covering Isambard-AI as a whole (both phases). ITPro reports it as the site draw. itpro.com
PUE 1.08 2026-10 Operator stated Bristol states 'around 1.08' for the modular data centre (direct liquid cooling); ITPro reports 1.1. Covers the whole site. bristol.ac.ukitpro.com

The read

The expansion that took Isambard-AI from a 34,272-core pilot to one of Europe's largest GPU fleets: 5,280 more GH200 superchips on the same Bristol site, bringing the combined total to 5,448. TOP500 carries phase 1 and this phase as two separate system entries with two separate HPL submissions rather than one upgraded machine, and this dataset follows that split rather than merging them.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

National Composites Centre, Bristol

Location
Bristol, United Kingdom
Cooling
Direct liquid cooling
Commissioned
2024

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA GH200 Grace Hopper Superchip, NVIDIA Grace, HPE Slingshot-11, HPE Cray ClusterStor E1000, HPE Cray Operating System
bristol.ac.uknames system and partNVIDIA GH200 Grace Hopper Superchip, NVIDIA Grace, HPE Cray ClusterStor E1000, VAST Data Platform, Direct liquid cooling, warm water, HPE Cray Operating System

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • Isambard-AI phase 2 goes live as the UK's most powerful AI supercomputer · NVIDIA Blog
    5,448 GH200 superchips across a purpose built 5MW facility that went from conception to operation in about two years, reported as more than ten times faster than the next UK system at the time. It is the clearest UK entry in this dataset's post-2023 Grace Hopper wave alongside LUMI and Alps.

All news →

Further reading