Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
4.29 PFlop/s
HPL measured
Rpeak
5.03 PFlop/s
Rmax ÷ Rpeak
85.3%
Cores
393,216
Power
1.97 MW
Per watt
2.2 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Vulcan, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax4.29 PFlop/s#7 of 193 · top 3%#89 of 332 · top 27%
Energy efficiency2.2 GF/W#27 of 149 · top 18%#81 of 162 · top 50%
Rmax ÷ Rpeak85.3 %#65 of 192 · top 34%#50 of 331 · top 15%
Power draw1,972 kW#18 of 151 · top 11%#31 of 171 · top 18%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
IBM Blue Gene/Q, 24 racks
IBM - Verified top500.orghpc.llnl.gov
CPU IBM PowerPC A2 (Power BQC)
CPUs
PowerPC A2 · 18C · 1.6 GHz · 45 nm · 55 W
Power BQC 16C 1.6GHz
IBM - Reported top500.orghpc.llnl.gov
Interconnect IBM BlueGene/Q 5D torus
Interconnect
5D torus · 2 GB/s per link per direction
5D torus
IBM - Reported hpc.llnl.gov
Operating system IBM Compute Node Kernel
Operating systems
Microkernel, no dynamic scheduling · Proprietary
RHEL with Compute Node Kernel
IBM - Reported hpc.llnl.gov

Engineering, funding and access

What Vulcan runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes24,576 nodes22,528 batch, 2,048 debug and 8 login nodes listed on the decommissioned-platform page.2026-11Operator statedhpc.llnl.gov
Total memory384 TBLLNL lists 393,216 GiB total (16 GiB per node), which is 384 TiB.2026-11Operator statedhpc.llnl.gov
Interconnect and topologyBlue Gene/Q 5D torus2026-11Operator statedhpc.llnl.gov

Software

ItemDetailAs ofBasisSource
Job schedulerSlurm (srun)2026-11Operator statedhpc.llnl.gov
Programming and software stackRHEL front end with the Compute Node Kernel (CNK) on compute nodes2026-11Operator statedhpc.llnl.gov

Funding

ItemDetailAs ofBasisSource
Funded byNNSA Advanced Simulation and Computing (ASC) and M&IC programs1.5 of Vulcan's 5 PFlop/s directly supported NNSA's mission to enhance US economic competitiveness.2026-11Operator statedhpc.llnl.gov
ProcurementPart of the contract that brought Sequoia to Livermore2026-11Operator statedhpc.llnl.gov

Access

ItemDetailAs ofBasisSource
How researchers get timeHigh Performance Computing Innovation Center (HPCIC) partnerships, plus NNSA research programs, academic alliances and LLNL institutional scienceIndustrial partners could run open publishable or proprietary work.2026-11Operator statedhpc.llnl.gov

The read

Livermore's 24-rack IBM Blue Gene/Q, the smaller sibling of Sequoia, shared between the ASC programme and the industry-facing M&IC programme, with 1.5 of its 5 PFlop/s reserved for collaborations with industry and universities. It first appeared on the June 2012 TOP500 as a partial machine, was 65th on the November 2012 list once complete, and reached ninth in June 2013. LLNL's ASC page gives service as 2012 to 2019; LLNL's pages are one organization, so they do not corroborate each other. LLNL and TOP500 agree on the 393,216 cores. TOP500 is the only source for Rmax and Rpeak, so the tier is reported.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Livermore Computing Center

Location
Livermore, CA, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
1996

Change history

Nearby in scale

The machines closest to Vulcan by Rmax, smaller to larger.

  • Manzano · USA, operational · 4.28 PFlop/s
  • Cannon2-H200 · USA, operational · 4.24 PFlop/s
  • Noctua 2 · Germany, operational · 4.19 PFlop/s
  • Oakbridge-CX · Japan, decommissioned · 4.29 PFlop/s
  • Viper-CPU · Germany, operational · 4.29 PFlop/s
  • CRONOS · France, operational · 4.3 PFlop/s

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
hpc.llnl.govnames system and partIBM PowerPC A2 (Power BQC), IBM Compute Node Kernel
top500.orgnames system and partIBM BlueGene/Q 5D torus

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading