France · planned · mixed

Alice Recoque

Operated by CEA at CEA/DAM .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Eviden BullSequana XH3500
Eviden
ATOEPA rolls up to Atos
- Reported genci.frwww-hpc.cea.fr
Accelerator AMD Instinct MI430X
Accelerators
AMD Instinct MI430X with 432 GB HBM4
AMD - Reported genci.frwww-hpc.cea.fr
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
warm-water direct liquid cooling
Eviden
ATOEPA rolls up to Atos
- Reported www-hpc.cea.fr

Engineering, funding and access

What Alice Recoque runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyEviden BXI v3 in a DragonFly+ topology, with 800 Gb/s links per GPU and 400 Gb/s per CPUJoint GENCI and CEA material2025-11-18Operator statedgenci.frwww-hpc.cea.fr
Cooling designFifth-generation warm-water direct liquid cooling for the unified GPU racks and chilled doors for the scalar racks; the TGCC gained a dedicated 20 MW warm-water loop2025-11-18Operator statedgenci.frwww-hpc.cea.fr

Funding

ItemDetailAs ofBasisSource
Funded byEuroHPC Joint Undertaking2025-11-18Operator statedgenci.fr
Funded byFrance, the Netherlands and Greece through the Jules Verne consortium (GENCI with CEA, SURF and GRNET)2025-11-18Operator statedgenci.frwww-hpc.cea.fr
Funding programmeEuroHPC exascale procurement co-funded by the Jules Verne consortium; total investment of 554 million euros covering five years of operation2025-11-18Operator statedgenci.fr
ProcurementEuroHPC JU call for tender in September 2024; Eviden selected, announced 18 November 2025, for a BullSequana XH3500 system with 94 racks of AMD Instinct MI430X GPUs and a SiPearl Rhea2 scalar partition2025-11-18Operator statedwww-hpc.cea.frgenci.fr

Access

ItemDetailAs ofBasisSource
How researchers get timeShared by EuroHPC JU and the Jules Verne consortium in proportion to investment, through EuroHPC Access Calls and the hosts' own project selection, for European academia, industry and public services; user access from 20272025-11-18Operator statedgenci.frwww-hpc.cea.fr

The read

France's EuroHPC exascale system, to be operated by CEA at its TGCC computing centre and built by Eviden as a BullSequana XH3500 with AMD EPYC Venice CPUs, Instinct MI430X GPUs, DDN storage and warm-water liquid cooling. EuroHPC selected the supplier in November 2025 for installation from 2026 and user access in 2027. GENCI states under 15 MW and over one exaflop of double-precision HPL; it has not run, so no FLOPS or rank is recorded. The GENCI and CEA pages share a joint release, so they are one source in effect and the tier is reported. The site is CEA's existing Bruyeres-le-Chatel entry, the nearest city-level match.

Timeline

  • 2023-06 Announced source
  • 2024-09 EuroHPC JU launched the call for tender for the system source
  • 2025-11-18 EuroHPC JU and the Jules Verne consortium selected Eviden to deliver the system, with installation starting in 2026 source

Site & facility

CEA/DAM

Location
Bruyeres-le-Chatel, France
Commissioned
2024

Change history

Same site

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
www-hpc.cea.frnames system and partAMD Instinct MI430X, Direct liquid cooling, warm water
genci.frnames system and partAMD Instinct MI430X, Direct liquid cooling, warm water