COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Tera-1000-2

France · operational · classified

Tera-1000-2

Operated by CEA at CEA/DAM .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
11.97 PFlop/s
HPL measured
Rpeak
23.40 PFlop/s
Rmax ÷ Rpeak
51.2%
Cores
-
Power
3.18 MW
Per watt
3.8 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tera-1000-2, and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax11.97 PFlop/s#16 of 234 · top 6%#6 of 52 · top 10%
Energy efficiency3.8 GF/W#54 of 158 · top 34%#19 of 42 · top 44%
Rmax ÷ Rpeak51.2 %#214 of 229 · bottom 8%#51 of 51 · bottom 1%
Power draw3,178 kW#10 of 161 · top 6%#4 of 42 · top 7%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Atos BullSequana X1000
Eviden
ATOEPA rolls up to Atos
- Verified cea.frtop500.org
Interconnect -
Bull BXI 1.2
Eviden
ATOEPA rolls up to Atos
- Verified cea.frtop500.org
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
warm water circulation as close as possible to processors
Eviden
ATOEPA rolls up to Atos
- Reported cea.fr

Engineering, funding and access

What Tera-1000-2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyBull eXascale Interconnect (BXI) 1.2, co-developed by CEA/DAM and AtosCEA describes BXI without the version number; TOP500 lists Bull BXI 1.22018-06-25Operator statedcea.frtop500.org
Cooling designWarm-water cooling circulated close to the processors, part of the BullSequana design2018-06-25Operator statedcea.fr

Software

ItemDetailAs ofBasisSource
Programming and software stackbullx SCS operating system2026-06Operator statedtop500.org
Programming and software stackIntel icc 17 compiler, Intel MKL and Open MPI 2.0.2 for the TOP500 HPL run2026-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
ProcurementSupplied by Atos in collaboration with Intel and CEA/DAM; deployed in two stages, a Xeon partition in production since 2016 and a Xeon Phi Knights Landing partition2018-06-25Operator statedcea.fr

The read

CEA's defence-programme Atos BullSequana X1000 system of Xeon Phi 7250 nodes on the Bull BXI network, warm-water cooled, deployed in two stages at Bruyeres-le-Chatel. TOP500 lists a first stage (Tera-1000-2-Part 1) at 24th in November 2017 and the full machine at 14th in June 2018, the best rank; the full entry was still listed in June 2026. CEA and Atos say 540,000 cores where TOP500 counts 561,408, so no core count is recorded. The 25 PFlop/s CEA quotes covers the whole Tera-1000 programme including its earlier Xeon partition, so TOP500's 23.4 PFlop/s peak for this entry is used. TOP500 is the only source for Rmax, so the tier is reported.

Timeline

  • 2016 The first Tera-1000 partition (Intel Xeon) entered production at CEA before the Xeon Phi stage was added. source
  • 2017 First operational source
  • 2018-06 Listed at #14 on the TOP500 (June 2018) source
  • 2018-06-25 CEA announced the completed Atos Tera 1000 system at 25 PFlop/s, ranked 14th on the TOP500. source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

CEA/DAM

Location
Bruyeres-le-Chatel, France
Commissioned
2024

Where sources disagree

We record conflicts instead of picking a winner quietly. All open questions.

Change history

Nearby in scale

The machines closest to Tera-1000-2 by Rmax, smaller to larger.

  • Christofari Neo · Russia, operational · 11.95 PFlop/s
  • Carpenter · USA, operational · 11.62 PFlop/s
  • DeepL Ceres · Sweden, operational · 11.3 PFlop/s
  • ARF-ACC · Turkey, operational · 12.09 PFlop/s
  • HPC4 · Italy, operational · 12.21 PFlop/s
  • Kuma · Switzerland, operational · 12.31 PFlop/s

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
cea.frdoes not name this systemDirect liquid cooling, warm water
top500.orgnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading