Supercomputers/Systems/Tera-1000-2
France · operational · classified
Tera-1000-2
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 11.97 PFlop/s
- Rpeak
- 23.40 PFlop/s
- Rmax ÷ Rpeak
- 51.2%
- Cores
- -
- Power
- 3.18 MW
- Per watt
- 3.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tera-1000-2, and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 11.97 PFlop/s | #16 of 234 · top 6% | #6 of 52 · top 10% |
| Energy efficiency | 3.8 GF/W | #54 of 158 · top 34% | #19 of 42 · top 44% |
| Rmax ÷ Rpeak | 51.2 % | #214 of 229 · bottom 8% | #51 of 51 · bottom 1% |
| Power draw | 3,178 kW | #10 of 161 · top 6% | #4 of 42 · top 7% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Atos BullSequana X1000 | Eviden | - | Verified | cea.frtop500.org |
| Interconnect | - Bull BXI 1.2 | Eviden | - | Verified | cea.frtop500.org |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid warm water circulation as close as possible to processors | Eviden | - | Reported | cea.fr |
Engineering, funding and access
What Tera-1000-2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | Bull eXascale Interconnect (BXI) 1.2, co-developed by CEA/DAM and AtosCEA describes BXI without the version number; TOP500 lists Bull BXI 1.2 | 2018-06-25 | Operator stated | cea.frtop500.org |
| Cooling design | Warm-water cooling circulated close to the processors, part of the BullSequana design | 2018-06-25 | Operator stated | cea.fr |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | bullx SCS operating system | 2026-06 | Operator stated | top500.org |
| Programming and software stack | Intel icc 17 compiler, Intel MKL and Open MPI 2.0.2 for the TOP500 HPL run | 2026-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Supplied by Atos in collaboration with Intel and CEA/DAM; deployed in two stages, a Xeon partition in production since 2016 and a Xeon Phi Knights Landing partition | 2018-06-25 | Operator stated | cea.fr |
The read
CEA's defence-programme Atos BullSequana X1000 system of Xeon Phi 7250 nodes on the Bull BXI network, warm-water cooled, deployed in two stages at Bruyeres-le-Chatel. TOP500 lists a first stage (Tera-1000-2-Part 1) at 24th in November 2017 and the full machine at 14th in June 2018, the best rank; the full entry was still listed in June 2026. CEA and Atos say 540,000 cores where TOP500 counts 561,408, so no core count is recorded. The 25 PFlop/s CEA quotes covers the whole Tera-1000 programme including its earlier Xeon partition, so TOP500's 23.4 PFlop/s peak for this entry is used. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
- 2016 The first Tera-1000 partition (Intel Xeon) entered production at CEA before the Xeon Phi stage was added. source
- 2017 First operational source
- 2018-06 Listed at #14 on the TOP500 (June 2018) source
- 2018-06-25 CEA announced the completed Atos Tera 1000 system at 25 PFlop/s, ranked 14th on the TOP500. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Core count: 540,000 cores (CEA) against 561,408 (TOP500). No core count is recorded.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#184 on the 2025-06 list)
- 2026-09-20 Added with a rank pointer; core count conflict logged
Nearby in scale
The machines closest to Tera-1000-2 by Rmax, smaller to larger.
- Christofari Neo · Russia, operational · 11.95 PFlop/s
- Carpenter · USA, operational · 11.62 PFlop/s
- DeepL Ceres · Sweden, operational · 11.3 PFlop/s
- ARF-ACC · Turkey, operational · 12.09 PFlop/s
- HPC4 · Italy, operational · 12.21 PFlop/s
- Kuma · Switzerland, operational · 12.31 PFlop/s
Related systems
Same site
- Tera-1000-1 · France, operational, 2016
- Alice Recoque · France, planned
- CEA-HE · France, operational, 2024
- Tera-100 · France, decommissioned, 2010
- Tera-10 · France, decommissioned, 2006
- TERA-1 · France, decommissioned, 2001
Same operator
- Joliot-Curie KNL · France, decommissioned, 2017
- Joliot-Curie SKL · France, decommissioned, 2017
- Cobalt (CCRT) · France, operational, 2016
- Joliot-Curie Rome · France, operational
- CEA-HF · France, operational, 2021
- Topaze · France, operational, 2021
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| cea.fr | does not name this system | Direct liquid cooling, warm water |
| top500.org | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Power and cooling
Why air ran out at 20 kW a rack, how warm-water cooling removes the chillers, and what PUE conceals.