Companies/Groq
Mountain View, CA, USA
Groq
Deterministic single-core inference architecture with no caches and no dynamic scheduling, so latency is a compile-time property rather than a runtime one.
Systems this company appears in
- Systems
- 3
- Aggregate Rmax
- 0.0 GFlop/s
- Aggregate power
- 0 kW
- First appearance
- 2025-02
- Most recent
- 2025-11-17
- Concentration
- -
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 1 | 0.0 GFlop/s |
| Accelerator | 3 | 0.0 GFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| GroqCloud Dammam Inference Cluster Saudi Arabia · 2025-02 | Accelerator, Integrator | Groq | - | unranked |
| GroqCloud Sydney Inference Cluster Australia · | Accelerator | Groq | - | unranked |
| GroqCloud Kamloops Inference Cluster Canada · | Accelerator | Groq | - | unranked |
Parts supplied
| Part | Category | Generation | Released |
|---|---|---|---|
| Groq LPU | Accelerators | LPU | 2023 |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| GroqCloud Dammam Inference Cluster | operational | 19,000 | - |
| GroqCloud Sydney Inference Cluster | planned | - | 4.5 |
| GroqCloud Kamloops Inference Cluster | under construction | - | 7 |
Figures come from the AI datacenter metrics; blank means none recorded.
Compute deals
| Date | Role | Counterparty | Type | MW | Value ($bn) | Source |
|---|---|---|---|---|---|---|
| 2025-02-09 | Seller | Aramco Digital | Other | - | 1.5 | middleeastainews.comgroq.com |
Headline values are as announced and are not additive. See all compute deals.
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| Aramco Digital / Groq AI compute hub (Dammam) | Dammam, Saudi Arabia | - | 2025 |
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Power and cooling
The substation, the heat rejection plant, and the constraint that actually binds.