Supercomputers/Systems/Longhorn
USA · operational · mixed
Longhorn
Operated by Texas Advanced Computing Center at Texas Advanced Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 2.29 PFlop/s
- Rpeak
- 2.87 PFlop/s
- Rmax ÷ Rpeak
- 79.8%
- Cores
- 37,440
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Longhorn, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 2.29 PFlop/s | #151 of 230 · bottom 35% | #139 of 332 · top 42% |
| Rmax ÷ Rpeak | 79.8 % | #36 of 224 · top 16% | #114 of 331 · top 34% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM POWER9-hosted GPU system | IBM | - | Reported | texascale.orgtop500.org |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W 448 NVIDIA V100 GPUs (SXM2) | NVIDIA | 448 reported | Reported | texascale.orgtop500.org |
| CPU | - IBM POWER9 20C 3.6GHz | IBM | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Longhorn runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Red Hat Linux operating systemTOP500 list entry | 2019-11 | Operator stated | top500.org |
| Programming and software stack | IBM XL C and NVIDIA nvcc compilers with IBM ESSL and NVIDIA cuBLAS librariesTOP500 list entry for the HPL run | 2019-11 | Operator stated | top500.org |
| Programming and software stack | IBM Spectrum MPITOP500 list entry | 2019-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | Built as one of the two initial subsystems of Frontera, the NSF leadership-class system funded by a $60 million NSF awardTACC's Texascale magazine names Longhorn as a Frontera subsystem for AI, machine learning and molecular dynamics; no separate Longhorn budget is given | 2019 | Operator stated | texascale.org |
The read
IBM POWER9 GPU subsystem at the Texas Advanced Computing Center, announced alongside Frontera in 2019 with 448 NVIDIA V100 GPUs for machine learning, deep learning and molecular dynamics work. TOP500 lists 37,440 cores on InfiniBand EDR and 2.29 PFlop/s Rmax, debuting at rank 120 on the November 2019 list.
Timeline
- 2019 Announced source
- 2019 First operational source
- 2019-11 Listed at #120 on the TOP500 (November 2019) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Texas Advanced Computing Center
- Location
- Austin, TX, USA
- Cooling
- Direct liquid cooling
- Commissioned
- 2007
Change history
- 2026-10-02 Added Longhorn, TACC's POWER9 and V100 subsystem
Nearby in scale
The machines closest to Longhorn by Rmax, smaller to larger.
- Wilkes-3 · United Kingdom, operational · 2.29 PFlop/s
- Béluga · Canada, decommissioned · 2.28 PFlop/s
- Cumulus (Cambridge) · United Kingdom, operational · 2.27 PFlop/s
- Taiwania 3 · Taiwan, operational · 2.3 PFlop/s
- VSC-5 · Austria, operational · 2.31 PFlop/s
- Marlyn · USA, operational · 2.31 PFlop/s
Related systems
Same site
- Frontera · USA, decommissioned, 2019
- Lonestar6 · USA, operational
- Stampede2 · USA, decommissioned, 2017
- Lonestar 5 · USA, decommissioned, 2016
- Maverick (TACC) · USA, operational, 2014
- Stampede3 · USA, operational, 2024
Same operator
- Horizon · USA, under construction
- Vista (TACC) · USA, operational, 2024
- Stampede · USA, decommissioned, 2013
- Lonestar 4 · USA, decommissioned, 2011
- Ranger · USA, decommissioned, 2008
Same accelerator
- Artemis (G42) · United Arab Emirates, operational, 2019
- Barbora · Czechia, operational, 2019
- Béluga · Canada, decommissioned, 2019
- Cannon (FASRC) · USA, upgraded, 2019
- cHARISMa · Russia, operational, 2019
- Christofari · Russia, operational, 2019
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| texascale.org | names system, part and count | Mellanox InfiniBand EDR · counts: 448 |
| top500.org | names system and part | NVIDIA Tesla V100, Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.