Supercomputers/Systems/Google Pryor North TPU Campus

USA · operational · ai training

Google Pryor North TPU Campus

Deep dive: Anthropic and Google TPUs: stated vs modelled

Also known as Google Pryor (North)

Operated by Alphabet at Google Mayes County Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Google designs, builds and operates the Pryor, Mayes County, Oklahoma data center campus
Alphabet - Reported datacenters.google
Accelerator Google TPU v5p
Accelerators
TPU (systolic array) · 1.75 GHz
Epoch AI estimate: about 23,500 Google TPU v5p chips (modelled, not disclosed by Google)
Alphabet 23,500
estimated
Reported epoch.ai
Accelerator -
Epoch AI estimate: about 77,900 Google TPU v5e chips (modelled, not disclosed by Google)
Alphabet 77,900
estimated
Reported epoch.ai

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 101,400 accelerators 2026-10-02 Third-party estimate About 23,500 TPU v5p plus 77,900 TPU v5e (sum is ours). Epoch AI chip estimate (modelled from satellite imagery, cooling equipment and chip availability); not an operator disclosure. epoch.ai
Stated investment 13.9 USD bn 2026-10-02 Third-party estimate Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. epoch.ai
IT power 368 MW 2026-10-02 Third-party estimate Epoch AI modelled IT power from satellite imagery and permits; not operator-stated. epoch.ai
PUE 1.11 2026-06 Operator stated Google Mayes County, OK campus trailing-twelve-month PUE for Q2 2026 (quarterly also 1.11); campus-level, shared with other Google loads datacenters.google

The read

Google's TPU AI-compute campus at Pryor in Mayes County, Oklahoma, distinct from the 2022 Cloud TPU v4 ML hub row (google-tpu-v4-ml-hub-oklahoma) that shares the same county site. Google's Oklahoma page says Pryor has operated since 2007 and records 9 billion dollars of cloud and AI infrastructure investment announced in 2025 across Oklahoma sites; it states no TPU count or power for Pryor. Epoch AI's AI data centers dataset (CC BY 4.0), which models capacity from satellite imagery, cooling equipment and chip availability, estimates about 23,500 TPU v5p and 77,900 TPU v5e chips and 368 MW of IT power as of 2 October 2026, with the first building operational in July 2024. Those are modelled third-party estimates, recorded only as estimates in the metrics table. Google reports a campus trailing-twelve-month PUE of 1.11 for Mayes County (Q2 2026). Hardware rests on Epoch alone, so the tier is reported.

Timeline

Site & facility

Google Mayes County Data Center

Location
Mayes County, OK, USA
PUE
1.1

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
datacenters.googlenames system and partGoogle TPU v5p
epoch.ainames system and partGoogle TPU v5p

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.