Supercomputers/Systems/Google Pryor North TPU Campus
USA · operational · ai training
Google Pryor North TPU Campus
Deep dive: Anthropic and Google TPUs: stated vs modelled
Also known as Google Pryor (North)
Operated by Alphabet at Google Mayes County Data Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Google designs, builds and operates the Pryor, Mayes County, Oklahoma data center campus | Alphabet | - | Reported | datacenters.google |
| Accelerator | Google TPU v5p Accelerators TPU (systolic array) · 1.75 GHz Epoch AI estimate: about 23,500 Google TPU v5p chips (modelled, not disclosed by Google) | Alphabet | 23,500 estimated | Reported | epoch.ai |
| Accelerator | - Epoch AI estimate: about 77,900 Google TPU v5e chips (modelled, not disclosed by Google) | Alphabet | 77,900 estimated | Reported | epoch.ai |
Engineering, funding and access
What Google Pryor North TPU Campus runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Evaporative cooling towers: Epoch AI counts 64 SPX NC8422V-1 units with 483.8 MW capacityCounted from satellite and drone imagery, not stated by Google. | 2026-09 | Third-party estimate | epoch.ai |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 101,400 accelerators | 2026-10-02 | Third-party estimate | About 23,500 TPU v5p plus 77,900 TPU v5e (sum is ours). Epoch AI chip estimate (modelled from satellite imagery, cooling equipment and chip availability); not an operator disclosure. | epoch.ai |
| Stated investment | 13.9 USD bn | 2026-10-02 | Third-party estimate | Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. | epoch.ai |
| IT power | 368 MW | 2026-10-02 | Third-party estimate | Epoch AI modelled IT power from satellite imagery and permits; not operator-stated. | epoch.ai |
| PUE | 1.11 | 2026-06 | Operator stated | Google Mayes County, OK campus trailing-twelve-month PUE for Q2 2026 (quarterly also 1.11); campus-level, shared with other Google loads | datacenters.google |
The read
Google's TPU AI-compute campus at Pryor in Mayes County, Oklahoma, distinct from the 2022 Cloud TPU v4 ML hub row (google-tpu-v4-ml-hub-oklahoma) that shares the same county site. Google's Oklahoma page says Pryor has operated since 2007 and records 9 billion dollars of cloud and AI infrastructure investment announced in 2025 across Oklahoma sites; it states no TPU count or power for Pryor. Epoch AI's AI data centers dataset (CC BY 4.0), which models capacity from satellite imagery, cooling equipment and chip availability, estimates about 23,500 TPU v5p and 77,900 TPU v5e chips and 368 MW of IT power as of 2 October 2026, with the first building operational in July 2024. Those are modelled third-party estimates, recorded only as estimates in the metrics table. Google reports a campus trailing-twelve-month PUE of 1.11 for Mayes County (Q2 2026). Hardware rests on Epoch alone, so the tier is reported.
Timeline
Site & facility
Google Mayes County Data Center
- Location
- Mayes County, OK, USA
- PUE
- 1.1
Change history
- 2026-10-04 Added Google Pryor North TPU Campus
Nearby in scale
The machines closest to Google Pryor North TPU Campus by accelerator count, smaller to larger.
- STACKIT Lubbenau AI Data Center · Germany, under construction · 100,000 accelerators
- Denton (CoreWeave) · USA, operational · 100,000 accelerators
- JD Cloud 100,000-GPU Cluster · China, planned · 100,000 accelerators
- Microsoft Project Osmium · USA, operational · 103,200 accelerators
- Nscale Texas GB300 Campus (Microsoft) · USA, planned · 104,000 accelerators
- Microsoft Goodyear AI Datacenter · USA, operational · 116,400 accelerators
Related systems
Same site
- Google TPU v4 ML Hub (Oklahoma) · USA, operational, 2022
Same operator
- Google Columbus TPU Campus · USA, operational, 2024
- Google Council Bluffs East TPU Campus · USA, operational, 2024
- Google New Albany TPU Campus · USA, operational, 2024
- Google TPU v6e (Trillium) pod · USA, operational, 2024
- Google India AI Hub (Vizag) · India, under construction
- Google TPU (Ironwood) capacity for Anthropic · USA, under construction
Same accelerator
- Google TPU v5p pod · USA, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| datacenters.google | names system and part | Google TPU v5p |
| epoch.ai | names system and part | Google TPU v5p |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.