Supercomputers/Systems/Cerebras Columbiana (Digi Power X)
USA · under construction · ai inference
Cerebras Columbiana (Digi Power X)
Also known as Digi Power X Alabama AI data center
Operated by Cerebras at Columbiana Alabama AI Site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Digi Power X builds the 40 MW Columbiana data center in two phases, 15 MW then 25 MW, leased in full to Cerebras | Digi Power X | - | Reported | baxtel.com |
The read
A 40 MW AI data center in Columbiana, Alabama, being built by Digi Power X (formerly Digihost) in two phases, 15 MW by the end of 2026 and a further 25 MW by the end of the first quarter of 2027, with Cerebras having signed for the full capacity in May 2026. Digi Power X announced a 200 million dollar debt commitment syndicated by Goldman Sachs (reported 14 October 2026) and says the project is on schedule; it also mentions modular 'Arms 200' compute units, one deployment already running. Hardware inside the site is not itemised, so no Cerebras system count is entered, and the row sits under Cerebras as the sole tenant in line with cerebras-oklahoma-city and cerebras-mikkeli-finland. Single trade source (Baxtel).
Timeline
- 2026-05 Announced source
Site & facility
Change history
- 2026-10-17 Added Cerebras Columbiana (Digi Power X) (Cerebras)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| baxtel.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.