COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/SINES Data Campus GB300 Deployment

Portugal · operational · ai training

SINES Data Campus GB300 Deployment

Deep dive: How Nebius and Nscale build GPU clouds

Also known as SIN01

Operated by Microsoft at Start Campus SINES Data Campus (SIN01) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Deployed and operated as infrastructure platform partner by Nscale
Nscale
- Reported nscale.com
Integrator -
Hosted at Start Campus's SIN01 facility within the 1.2 GW SINES Data Campus
Start Campus
- Reported lp.startcampus.pt
Accelerator NVIDIA GB300 NVL72
Accelerators
12,600 NVIDIA GB300 NVL72 (Blackwell Ultra) GPUs
NVIDIA 12,600
verified
Verified nscale.comlp.startcampus.pt

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 12,600 accelerators 2026-05 Operator stated Blackwell Ultra GPUs stated as already deployed at Sines. A further 66,000+ Rubin GPUs are planned from late 2027. nscale.com
PUE 1.1 2026-05 Design target Campus target of PUE 1.1 stated in the Start Campus boilerplate of the Nscale release; not a measured figure. nscale.com
WUE 0 L/kWh 2026-05 Design target Campus target of WUE 0 (liquid cooling plus ocean-water heat rejection) in the Start Campus boilerplate; not a metered figure. nscale.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Other Start Campus - operating 2026-10 Operator stated Start Campus says the SINES campus uses 100% renewable energy; contract form (PPA, grid mix or certificates) and MW not disclosed. Page undated. nscale.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

The initial phase of Nscale's Microsoft-tenanted deployment at Start Campus's SIN01 data centre in Sines, Portugal: 12,600 NVIDIA GB300 NVL72 (Blackwell Ultra) GPUs, described at announcement in October 2025 as the European Union's first and largest Blackwell Ultra deployment. Nscale's own press release, announcing a follow-on 66,000+ Rubin GPU expansion, states the original 12,600 GPUs are 'already deployed' and that SIN01 is 'now at full capacity' on the back of oversubscribed demand, which is why this row is recorded as operational rather than under construction; Start Campus's own page independently confirms the same 12,600 GPU figure, the GB300 NVL72 platform name and the Q1 2026 target date. Operator is recorded as Microsoft, the named tenant, for consistency with this dataset's other two Nscale-built, Microsoft-tenanted rows (the Loughton and Narvik campuses); Nscale and Start Campus both appear as component edges below. The follow-on 66,000+ GPU Rubin expansion starting late 2027 is a separate future phase and is not counted in this row's figures. No FLOPS or HPL figure has been published for either phase.

Timeline

Site & facility

Start Campus SINES Data Campus (SIN01)

Location
Sines, Portugal
Cooling
Ocean-based liquid cooling
PUE
1.1
Substation
1200 MW
Commissioned
2026

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
lp.startcampus.ptnames system, part and countNVIDIA GB300 NVL72 · counts: 12600
nscale.comnames system only · counts: 12600

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.