COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Alpine (CU Boulder)

USA · operational · mixed

Alpine (CU Boulder)

Also known as Alpine

Operated by University of Colorado Boulder .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
NVIDIA A100 (36), H200 (32), RTX Pro 6000 (32), L40 (9) and Grace Hopper GPUs
NVIDIA - Reported curc.readthedocs.io
Accelerator -
AMD MI100 GPUs, 8 nodes with 3 each
AMD 24
reported
Reported curc.readthedocs.io
CPU -
AMD Milan and newer AMD CPU nodes
AMD - Reported curc.readthedocs.io
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
HDR-100 InfiniBand (200 Gb inter-node fabric)
NVIDIA - Reported curc.readthedocs.io

Engineering, funding and access

What Alpine (CU Boulder) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes489 nodes2026-10Operator statedcurc.readthedocs.iocurc.readthedocs.io
Interconnect and topologyHDR-100 InfiniBand (200 Gb) on most CPU nodes; 2 x 25 Gb Ethernet with RoCE on high-memory, A100, MI100, L40 and some CPU nodes; 100 Gb Ethernet on the H200 and RTX Pro 6000 nodes2026-10Operator statedcurc.readthedocs.io

Software

ItemDetailAs ofBasisSource
Job schedulerSlurm with fairshare; allocations are Slurm accounts2026-10Operator statedcurc.readthedocs.io

Funding

ItemDetailAs ofBasisSource
Funded byU.S. National Science Foundation, award 22015382026-10Operator statedcurc.readthedocs.io
Funded byCU Boulder, CU Anschutz and Colorado State University, which jointly fund it and contribute hardware2026-10Operator statedcurc.readthedocs.io

Access

ItemDetailAs ofBasisSource
How researchers get timeEvery CURC user gets a Trailhead allocation; CU Boulder groups can request Ascent (450,000 SUs a year) or Peak (up to 7.5 million SUs, Allocations Committee review) and RMACC users RMACC Ascent (250,000 SUs); CSU and Anschutz allocate locally2026-10Operator statedcurc.readthedocs.io
Access pagecurc.readthedocs.io/en/latest/clusters/alpine/allocations.htmlAlpine allocations page2026-10Operator statedcurc.readthedocs.io

The read

A heterogeneous HPC cluster run by the University of Colorado Boulder Research Computing group with contributed hardware from CU Boulder, CU Anschutz and Colorado State University, funded in part by National Science Foundation award 2201538. The hardware page lists 489 compute nodes: AMD Milan and newer AMD CPU nodes plus 36 NVIDIA A100, 24 AMD MI100, 32 NVIDIA H200, 32 NVIDIA RTX Pro 6000, 9 NVIDIA L40 and 2 Grace Hopper GPUs, with HDR-100 InfiniBand (200 Gb inter-node fabric). The page gives per-contributor tables and no single core total, so cores are left blank. Both cited pages are Research Computing documentation, so confidence stays reported. No benchmark FLOPS are published.

Timeline

  • 2022-05-18 Phase 1 of Alpine was released to users source
  • 2022-09 Phase 2 of Alpine was released source
  • 2023-07 Phase 3 of Alpine was released source

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
curc.readthedocs.ionames system and partNVIDIA InfiniBand HDR
curc.readthedocs.ionames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading