Supercomputers/Systems/Bitdeer AI Johor (A201)

Malaysia · under construction · mixed

Bitdeer AI Johor (A201)

Also known as Bitdeer Johor Bahru A201 GB300

Operated by Bitdeer at Johor Bahru A201-A202 Campus .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bitdeer AI develops and operates the liquid-cooled A201 facility
Bitdeer
- Reported finviz.com
Accelerator NVIDIA GB300 NVL72
Accelerators
More than 100 NVIDIA GB300 NVL72 racks procured ahead of energization (rack count, not a GPU count)
NVIDIA - Reported finviz.comsec.gov
Accelerator NVIDIA Vera Rubin
Accelerators
Part of the rack space is designed to support NVIDIA Vera Rubin (design provision, not installed)
NVIDIA - Reported finviz.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
IT power 21.7 MW 2026-10-19 Design target Bitdeer's pipeline table gives 21.7 MW of IT load for A201, energization targeted Q1 2027. sec.govfinviz.com

The read

Bitdeer AI's 29 September 2026 release says it has off-take commitments for more than 70% of the roughly 21.7 MW A201 liquid-cooled data center in Johor Bahru, worth more than $1.7B over five years, built for rack-scale NVIDIA GB300 NVL72 with part of the rack space designed for Vera Rubin. Bitdeer states it has already bought more than 100 GB300 NVL72 racks from an unaffiliated supplier ahead of energization. The release targets energization in Q1 2027; Bitdeer's 19 October 2026 operations update lists ready-for-service January 2027 and full deployment and go-live in April 2027. At 72 GPUs per NVL72 rack, more than 100 racks would imply over 7,000 GPUs, but that is arithmetic on the rack count and Bitdeer does not state a GPU total, so none is recorded. A201 shares the campus with bitdeer-ai-johor-a202 (65.1 MW); together they total 86.8 MW. Both sources are Bitdeer statements, so the tier is reported.

Timeline

Site & facility

Johor Bahru A201-A202 Campus

Location
Johor Bahru, Malaysia
Cooling
Liquid cooled

Change history