Supercomputers/Systems/Nebius Independence AI Factory

USA · under construction · ai training

Nebius Independence AI Factory

Also known as Project Sovereign

Operated by Nebius at Nebius Independence Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Nebius builds and owns the Independence AI factory campus, up to 1.2 GW, construction started May 2026
Nebius - Reported nebius.comsec.gov

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 1,200 MW 2026-03-03 Design target Nebius: potential capacity up to 1.2 GW; project page splits 800 MW utility and 400 MW on-site generation. IT vs total not stated. Campus-level, multi-year build. nebius.comnebius.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Grid Independence Power and Light - planned 2026-03 Operator stated Campus connects to Independence Power and Light, the municipal utility, structured not to raise residential rates. Up to 1.2 GW is campus capacity, not grid MW. nebius.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

Nebius's first gigawatt-scale US AI factory, a multi-building campus on about 400 acres in Independence, Missouri, approved by the city council on 3 March 2026 for up to 1.2 GW, with closed-loop cooling and connection to Independence Power and Light. Nebius's Q1 2026 shareholder letter (13 May 2026) says it broke ground in Missouri the day before and expects the Missouri and Alabama sites to be operational in 2027. No page names the GPU hardware or count. Both sources are Nebius's own, so the tier is reported. It has never submitted an HPL result.

Timeline

Site & facility

Nebius Independence Campus

Location
Independence, MO, USA
Utility
Independence Power & Light
Cooling
Closed-loop cooling

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
nebius.comnames system only-
sec.govnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.