Operates among the largest GPU fleets in the world for internal training; disclosure is via engineering blog rather than HPL submission.
Systems this company appears in
- Systems
- 12
- Aggregate Rmax
- 3.31 PFlop/s
- Aggregate power
- 349.5 kW
- First appearance
- 2017
- Most recent
- 2026-07-08
- Concentration
- 100%
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 12 | 3.31 PFlop/s |
| Storage | 2 | none published |
| Cooling | 2 | none published |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| Meta GenAI cluster (RoCE) USA · 2024-03 | Integrator, Storage, Cooling | Meta Platforms | - | unranked |
| Meta GenAI cluster (InfiniBand) USA · 2024-03 | Integrator, Storage, Cooling | Meta Platforms | - | unranked |
| Facebook DGX-1 Cluster USA · 2017 | Integrator | Meta Platforms | 3.31 PFlop/s | #32 June 2017 → |
| Meta Prometheus USA · | Integrator | Meta Platforms | - | unranked |
| Meta Hyperion USA · | Integrator | Meta Platforms | - | unranked |
| Meta Lebanon (Indiana) USA · | Integrator | Meta Platforms | - | unranked |
| Meta El Paso (Texas) USA · | Integrator | Meta Platforms | - | unranked |
| Meta Rosemount (Minnesota) USA · | Integrator | Meta Platforms | - | unranked |
| Meta Montgomery (Alabama) USA · | Integrator | Meta Platforms | - | unranked |
| Meta Cheyenne (Wyoming) USA · | Integrator | Meta Platforms | - | unranked |
| Meta Sturgeon Data Centre Canada · | Integrator | Meta Platforms | - | unranked |
| Meta Temple (Texas) USA · | Integrator | Meta Platforms | - | unranked |
Parts supplied
| Part | Category | Generation | Released |
|---|---|---|---|
| Meta MTIA v2 | Accelerators | MTIA | 2024 |
| Meta Grand Teton | Racks | Grand Teton | 2022 |
| Meta Tectonic | Storage | Tectonic | 2021 |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| Meta GenAI cluster (RoCE) | operational | 24,576 | - |
| Meta GenAI cluster (InfiniBand) | operational | 24,576 | - |
| Meta Research SuperCluster (RSC) | operational | 6,080 | - |
| Meta Prometheus | operational | 166,015 | 612 |
| Meta Hyperion | under construction | - | 2,260 |
| Meta Lebanon (Indiana) | under construction | - | 1,000 |
| Meta El Paso (Texas) | under construction | - | 1,000 |
| Meta Rosemount (Minnesota) | operational | 85,400 | 178 |
| Meta Montgomery (Alabama) | operational | 69,100 | 153 |
| Meta Cheyenne (Wyoming) | operational | 68,400 | 152 |
Figures come from the AI datacenter metrics; blank means none recorded.
Compute deals
| Date | Role | Counterparty | Type | MW | Value ($bn) | Source |
|---|---|---|---|---|---|---|
| 2026-03-31 | Buyer | CoreWeave | Cloud contract | - | 21 | sec.govsec.gov |
| 2026-03-13 | Buyer | Nebius | Cloud contract | - | 27 | sec.gov |
| 2026-02-23 | Buyer | AMD | Equity for compute | 6,000 | - | sec.gov |
| 2026-02-17 | Buyer | NVIDIA | Chip supply | - | - | nvidianews.nvidia.com |
| 2025-11 | Buyer | Nebius | Cloud contract | - | 2.9 | sec.gov |
| 2025-10 | Buyer | Blue Owl Capital | Joint venture | - | 12.3 | sec.gov |
| 2025-09-30 | Buyer | CoreWeave | Cloud contract | - | 14.2 | sec.govsec.gov |
| 2025-08-21 | Buyer | Alphabet | Cloud contract | - | 10 | cnbc.comdatacentrereview.com |
Headline values are as announced and are not additive. See all compute deals.
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| Meta (undisclosed US site) | USA | - | 2024 |
| Meta New Albany AI Campus (Prometheus) | New Albany, OH, USA | - | 2026 |
| Meta Richland Parish AI Campus (Hyperion) | Richland Parish, LA, USA | - | - |
| Meta Lebanon AI Campus | Lebanon, IN, USA | Closed-loop liquid cooling | - |
| Meta El Paso AI Campus | El Paso, TX, USA | Closed-loop liquid cooling | - |
| Meta Rosemount Data Center | Rosemount, MN, USA | - | - |
| Meta Montgomery Data Center | Montgomery, AL, USA | - | - |
| Meta Cheyenne Data Center | Cheyenne, WY, USA | - | - |
| Sturgeon County Data Centre Site | Sturgeon County, AB, Canada | Closed-loop liquid cooling with dry cooling | - |
| Meta Temple Data Center Site | Temple, TX, USA | - | - |
Related news
- Meta to expand Eagle Mountain data center campus in Utah · Data Center DynamicsMeta's fourth expansion of its Eagle Mountain, Utah campus pushes its investment there past $3 billion, adding self-built capacity outside the HPL-measured world this site otherwise tracks -- the same disclosed-versus-undisclosed distinction that motivates the shadow-list page. The new buildings will use closed-loop liquid cooling with dry cooling, a facility detail worth watching as more hyperscaler capacity shifts away from air.
- Panmnesia and Meta propose extending cache-coherent CXL beyond the rack to datacenter scale · HPCwireEvery interconnect row in this dataset describes a fabric that either stops at the rack or treats cross-rack traffic as a network hop; the proposal here is to hold one cache-coherent domain across a whole facility, which would turn that boundary from a given into a design choice. It is an invited review article with components claimed as validated silicon but no deployed system behind it, so nothing in it belongs in the parts layer yet.
- Louisiana regulators fast-track review of seven more gas plants for Meta's Hyperion campus · Union of Concerned ScientistsTen gas fired units totaling roughly 7.5 gigawatts, up from three approved in August 2025, would power a single Meta data center at a scale that a critic notes exceeds six times New Orleans' peak demand. It is a sharp illustration of the recurring finding elsewhere in this dataset that grid power, not chip supply, has become the binding constraint on gigawatt class AI campuses like Hyperion.
- Meta signs nuclear power deals with Oklo, Vistra and TerraPower for up to 6.6GW · Utility DiveVistra's contribution includes uprates at its existing Perry and Davis-Besse reactors, an operating asset route to new capacity that is faster than the Oklo and TerraPower agreements, which depend on advanced reactor designs not expected online before 2030 and 2032 respectively. Meta's Prometheus campus in Ohio, already in this dataset, is named as one beneficiary, though only a fraction of the contracted capacity is available on any timeline that matches Prometheus's 2026 target.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Storage and I/O
Parallel file systems, why checkpointing dominates the write load, and the metadata failure mode nobody expects.
Power and cooling
Why air ran out at 20 kW a rack, how warm-water cooling removes the chillers, and what PUE conceals.