Supercomputers/Systems/Irgetas

Kazakhstan · operational · mixed

Irgetas

Also known as NU Irgetas cluster; Nazarbayev University Irgetas

Operated by Nazarbayev University at Nazarbayev University (Astana) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
NVIDIA H100, four per GPU node on six GPU nodes
NVIDIA 24
reported
Reported scai.nu.edu.kz
CPU AMD EPYC 9004 (Genoa)
CPUs
x86-64 · 96C · 2.4 GHz · TSMC N5 · 360 W
AMD EPYC 9684X on CPU nodes and EPYC 9454 on GPU nodes, two per node
AMD - Reported scai.nu.edu.kz

The read

The newest of Nazarbayev University's research clusters in Astana, listed on the university's supercomputer page as ten CPU-only nodes with two 96-core AMD EPYC 9684X processors each and six GPU nodes with two 96-core EPYC 9454 CPUs and four NVIDIA H100 GPUs each (24 H100 in total), up to 768 GB of memory per node, scheduled with SLURM. The page also lists the older Shabyt and Muon clusters; ISSAI's separate AI cluster is its own row. The page gives no commissioning date, interconnect or peak figure, so those fields are blank and no core total is recorded. Only one page was fetched for this system, so the tier is reported.

Timeline

No dated events recorded.

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
scai.nu.edu.kznames system and partAMD EPYC 9004 (Genoa)

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.