Supercomputers/Systems/Microsoft Goodyear AI Datacenter

USA · operational · ai training

Microsoft Goodyear AI Datacenter

Also known as Microsoft Goodyear Arizona

Operated by Microsoft at Microsoft Goodyear Datacenter Campus .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Microsoft operates datacenters in Goodyear and El Mirage, Arizona (Greater Phoenix)
Microsoft - Reported local.microsoft.com
Accelerator -
Epoch AI estimate: about 58,300 NVIDIA H100 GPUs (modelled)
NVIDIA 58,300
estimated
Reported epoch.ai
Accelerator NVIDIA B200 SXM
Accelerators
CUDA (Blackwell) · TSMC 4NP · 1,000 W
Epoch AI estimate: about 58,100 NVIDIA B200 GPUs (modelled)
NVIDIA 58,100
estimated
Reported epoch.ai

Engineering, funding and access

What Microsoft Goodyear AI Datacenter runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designAir-cooled chillers: Epoch AI counts 80 units with 151.8 MW capacityCounted from satellite imagery; Microsoft does not describe the cooling.2026-04Third-party estimateepoch.ai

Results

ItemDetailAs ofBasisSource
Notable resultMicrosoft's MAI-Thinking-1 model was reportedly trained at this site in May 2026Epoch AI's report; not confirmed on a Microsoft page we fetched.2026-05Press reportepoch.ai

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 116,400 accelerators 2026-10-02 Third-party estimate About 58,300 H100 and 58,100 B200 (sum is ours); SemiAnalysis describes roughly 130,000 GPUs across four Arizona buildings. Epoch AI chip estimate (modelled from satellite imagery, cooling equipment and chip availability); not an operator disclosure. epoch.ai
Stated investment 7.7 USD bn 2026-10-02 Third-party estimate Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. epoch.ai
IT power 202 MW 2026-10-02 Third-party estimate Epoch AI modelled IT power from satellite imagery and permits; not operator-stated. epoch.ai

The read

Microsoft's Goodyear, Arizona datacenter campus (the PHX10 to PHX12 buildings on W Broadway Road, part of the West US 3 Azure region), which Epoch AI tracks as a Microsoft AI-compute site. Microsoft's Greater Phoenix community page confirms it operates datacenters in Goodyear and El Mirage but gives no hardware, MW or AI detail for the site. SemiAnalysis, summarised from its public article, describes an Arizona cluster of roughly 130,000 GPUs across four buildings, with H100 in 2023, H200 in 2024 and GB200 in 2025. Epoch AI's AI data centers dataset (CC BY 4.0) estimates about 58,300 H100 and 58,100 B200 chips and 202 MW of IT power as of 2 October 2026, with the first AI building operational in April 2023 (Epoch's date for AI compute, not the 2021 region launch), derived from Maricopa County permit records and satellite imagery. The estimates sit in the metrics table only. Hardware rests on third-party analysts, so the tier is reported.

Timeline

  • 2023-04 First operational source
  • 2025-01 Epoch AI estimates Building 2 operational, about 81 MW of IT load source
  • 2025-09 Epoch AI estimates Buildings 3 and 4 operational, about 202 MW of IT load source
  • 2026-04 Epoch AI sees foundations under way for Buildings 5 and 6 north of Building 4 source

Site & facility

Change history

Nearby in scale

The machines closest to Microsoft Goodyear AI Datacenter by accelerator count, smaller to larger.

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
epoch.ainames system and partNVIDIA B200 SXM
local.microsoft.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.