Supercomputers/Systems/Pangea III
France · operational · hpc
Pangea III
Operated by TotalEnergies at TotalEnergies CSTJF (Pau) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 17.86 PFlop/s
- Rpeak
- 25.03 PFlop/s
- Rmax ÷ Rpeak
- 71.4%
- Cores
- 291,024
- Power
- 1.37 MW
- Per watt
- 13.1 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Pangea III, and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 17.86 PFlop/s | #29 of 230 · top 12% | #5 of 52 · top 8% |
| Energy efficiency | 13.1 GF/W | #34 of 129 · top 26% | #10 of 42 · top 22% |
| Rmax ÷ Rpeak | 71.4 % | #81 of 224 · top 36% | #37 of 51 · bottom 29% |
| Power draw | 1,367 kW | #30 of 132 · top 22% | #11 of 42 · top 24% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM | IBM | - | Verified | top500.orgprnewswire.com |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W NVIDIA Tesla V100 | NVIDIA | - | Verified | prnewswire.comtop500.org |
| CPU | IBM POWER9 22C CPUs POWER · 22C · 3.07 GHz · 14 nm · 190 W IBM POWER9 18C 3.45GHz | IBM | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds Dual-rail Mellanox EDR InfiniBand | NVIDIA | - | Reported | top500.org |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 7.6 | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What Pangea III runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 50 PB | 2019-06 | Vendor stated | prnewswire.com |
| Interconnect and topology | Dual-rail Mellanox EDR InfiniBand | 2019-06 | Operator stated | top500.orgprnewswire.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | RHEL 7.6, IBM XL 16.1 and IBM Spectrum MPI 10.2 (as submitted for the TOP500 HPL run) | 2019-06 | Operator stated | top500.org |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2019: ranked 11th on the June 2019 TOP500; IBM says Total reports about 1.5 MW draw versus 4.5 MW for its predecessor | 2019-06 | Vendor stated | prnewswire.comtop500.org |
The read
TotalEnergies' IBM POWER9 and NVIDIA V100 system in Pau, eleventh on the June 2019 TOP500 and the most powerful commercial machine when built. TotalEnergies said in April 2024 that it was still in service and has since added Pangea 4 and announced Pangea 5. IBM quotes 25 PFlop/s and TotalEnergies 31.7 for the same machine; TOP500's 25.03 is used. TOP500's plain 'Pangea' is a different, older SGI machine. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Peak performance: 25 PFlop/s (IBM and TOP500) against 31.7 PFlop/s (TotalEnergies). TOP500's figure is used.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#61 on the 2023-11 list)
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Nearby in scale
The machines closest to Pangea III by Rmax, smaller to larger.
- Titan · USA, decommissioned · 17.59 PFlop/s
- OpenCanvas GPUaaS SP1 · Japan, operational · 17.53 PFlop/s
- HiPerGator AI · USA, operational · 17.49 PFlop/s
- AI-Farabium · Kazakhstan, operational · 17.93 PFlop/s
- Guru · South Korea, operational · 18 PFlop/s
- Maru · South Korea, operational · 18 PFlop/s
Related systems
Same site
- Pangea II · France, upgraded, 2016
- Pangea 4 · France, operational, 2024
- Pangea 5 · France, planned
- Rostand · France, operational, 2008
Same operator
- Laure · France, operational, 2013
Same accelerator
- Artemis (G42) · United Arab Emirates, operational, 2019
- Barbora · Czechia, operational, 2019
- Béluga · Canada, decommissioned, 2019
- Cannon (FASRC) · USA, upgraded, 2019
- cHARISMa · Russia, operational, 2019
- Christofari · Russia, operational, 2019
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| prnewswire.com | names system and part | IBM POWER9 22C, NVIDIA Tesla V100 |
| top500.org | names system and part | IBM POWER9 22C, Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.