Operated by CoreWeave at Core Scientific Denton Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Core Scientific hosts CoreWeave at Denton: about 260 MW of critical IT load, about 260 MW billing in July 2026
Core Scientific - Reported investors.corescientific.cominvestors.corescientific.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 100,000 accelerators 2026-07-03 Third-party estimate Epoch AI chip estimate, latest per chip type (B200); some rows are company disclosures, others modelled. Epoch notes Core Scientific cites over 50,000 GPUs at about 130 MW. epoch.ai
Stated investment 9.9 USD bn 2026-09-01 Third-party estimate Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. epoch.ai
Facility power 367 MW 2026-09-01 Third-party estimate Epoch AI modelled gross facility power (IT plus cooling and overhead) at this timeline date. epoch.ai
IT power 260 MW 2026-07 Operator stated Core Scientific Q2 FY26 deck (mid-July 2026): Denton about 260 MW leased to CoreWeave, substantially complete. Feb 2025 release also says about 260 MW critical IT. investors.corescientific.cominvestors.corescientific.com

The read

Core Scientific's Denton, Texas campus, the largest of its CoreWeave-contracted sites. A 26 February 2025 expansion added 70 MW, bringing Denton to about 260 MW of critical IT load for CoreWeave and CoreWeave's total contract with Core Scientific to about 590 MW across six sites. Core Scientific's Q2 2026 earnings deck of 28 July 2026 lists Denton at about 260 MW leased and billing, marked substantially complete, so the status is operational. CoreWeave is recorded as operator because it is the named tenant; Core Scientific is landlord. Neither page names the GPU model or count, so no accelerator edge is recorded. Both sources are Core Scientific's own, so the tier is reported. It has never submitted an HPL result.

Timeline

No dated events recorded.

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
investors.corescientific.comnames system only-
investors.corescientific.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading