Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 19.2 GFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- 128
- Power
- 41.4 kW
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Cray Research, Inc. Cray T3D, 64 processors upgraded to 128 in 1997 | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cisl.ucar.eduen.wikipedia.org |
| CPU | - Cray T3D processing elements at 150 MHz, 128 after the 1997 upgrade | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | 128 reported | Reported | cisl.ucar.edu |
| Operating system | - UNICOS MAX | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cisl.ucar.edu |
The read
NCAR's T3D came online on 1 July 1994 as a massively parallel system with 64 processors, doubled to 128 in a 1997 upgrade. NCAR gives 1,024 megawords (8 GB) of memory, a 6.67 ns clock, about 41.4 kW and a 19.2 GFLOPS peak. It was funded jointly by the US High Performance Computing and Communications Program and the Global Change Research Program and was used mainly by the NCAR Climate Simulation Laboratory. It was tightly coupled to the Cray C90 Antero and had no system name of its own; it ran UNICOS MAX. NCAR stopped maintenance in December 1998, operated it until 1 June 1999, and removed it to make room for the IBM SP Blackforest. The core count is the post-1997 figure. NCAR is the primary source, so the tier is reported.
Site & facility
NCAR Mesa Laboratory (Boulder)
- Location
- Boulder, CO, USA
- Commissioned
- 1986
Change history
- 2026-10-09 Added NCAR Cray T3D
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| en.wikipedia.org | names system only | - |
| cisl.ucar.edu | names system only | - |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.