Supercomputers/Systems/Stampede3
USA · operational · hpc
Stampede3
Operated by Texas Advanced Computing Center at Texas Advanced Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell Technologies and Intel | Dell Technologies | - | Reported | tacc.utexas.edu |
| Accelerator | Intel Data Center GPU Max 1550 Accelerators oneAPI (Xe-HPC) · Intel 7 / TSMC N5 · 600 W Intel Data Center GPU Max nodes | Intel | - | Reported | tacc.utexas.edu |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 24 nodes of four NVIDIA H100 SXM5 | NVIDIA | 96 reported | Reported | docs.tacc.utexas.edu |
| Interconnect | Omni-Path Architecture Interconnect Fat tree · 100 Gb/s per port · About 1 microsecond Omni-Path | Intel | - | Reported | docs.tacc.utexas.edutacc.utexas.edu |
| Storage | VAST Data Platform Storage Disaggregated shared-everything shared VAST file system for home and scratch | VAST Data | - | Reported | docs.tacc.utexas.edu |
Engineering, funding and access
What Stampede3 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,891 nodesDerived from the user guide: 560 Xeon Max (SPR) + 1,060 Skylake + 224 Ice Lake + 3 Ice Lake NVDIMM + 24 H100 (four H100 SXM5 each) + 20 Ponte Vecchio (four Max 1550 each) nodes; UT News gave 2,044 compute nodes and almost 200,000 cores in May 2024 | 2026-09 | Operator stated | docs.tacc.utexas.edunews.utexas.edu |
| Total memory | 350 TBUT News states more than 350 TB of RAM at full production | 2024-05 | Operator stated | news.utexas.edu |
| Storage capacity | 10 PBVAST Data all-flash system, 10 PB usable, rated at 50 GB/s write and 500 GB/s read; TACC called it its first storage system with no spinning disk | 2024-05 | Operator stated | news.utexas.edudocs.tacc.utexas.edu |
| Interconnect and topology | Omni-Path fat tree at 100 Gb/s (Skylake leaves 28/20 oversubscribed, Xeon Max and Ponte Vecchio nodes non-blocking); H100 nodes on NVIDIA NDR InfiniBand at 200 Gb/sUT News (May 2024) said a 400 Gb/s Cornelis CN5000 Omni-Path network would be deployed later in 2024; the September 2026 user guide still describes that upgrade as planned | 2026-09 | Operator stated | docs.tacc.utexas.edunews.utexas.edu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | VAST all-flash for $HOME and $SCRATCH (about 10 PB), plus TACC's shared Stockyard Lustre $WORK file system | 2026-09 | Operator stated | docs.tacc.utexas.edu |
| Job scheduler | SlurmQueues include skx (up to 256 nodes per job), spr and icx (up to 32 nodes) and h100 and pvc (up to 4 nodes), each with a 48-hour limit | 2026-09 | Operator stated | docs.tacc.utexas.edu |
| Programming and software stack | Rocky Linux operating system with Lmod modules | 2026-09 | Operator stated | docs.tacc.utexas.edu |
| Programming and software stack | Intel oneAPI and GNU compilers, Intel MPI launched with TACC's ibrun, and Intel oneMKLUser guide examples show intel/24.0.0, gcc/13.2.0 and impi/21.11 | 2026-09 | Operator stated | docs.tacc.utexas.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | U.S. National Science Foundation (award 2320757)Award title: Category I: Stampede3, Modernizing and Evolving The Largest ACCESS Compute Resource; PI John E Cazes (formerly Tommy K Minyard); runs 2023-10-01 to 2029-09-30 | 2023-10 | Operator stated | api.nsf.govdocs.tacc.utexas.edu |
| Funding programme | NSF Category I award under the Innovative HPC and Equipment Acquisitions programs (Cyberinfrastructure, CISE Research Resources) | 2023-10 | Operator stated | api.nsf.gov |
| Stated cost | 10 USD mA $10 million NSF award per UT News, matching the NSF record's estimated total of $10,000,000; the record shows $29,399,998 obligated across FY2023 and FY2024. Award figure, not an audited hardware cost | 2024-05 | Operator stated | news.utexas.eduapi.nsf.gov |
| Procurement | Built with Dell Technologies and Intel: 560 new Xeon CPU Max nodes and 20 Dell PowerEdge XE9640 servers with 80 Intel Data Center GPU Max 1550s, reusing 224 Ice Lake nodes added to Stampede2 in 2021 and more than 1,200 older Stampede2 Xeon nodes | 2024-05 | Operator stated | news.utexas.edu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | NSF ACCESS allocations; all Stampede3 requests go through the ACCESS allocations system, and the TACC User Portal redirects allocation management to ACCESS | 2026-09 | Operator stated | docs.tacc.utexas.edu |
| Access page | allocations.access-ci.org | 2026-09 | Operator stated | docs.tacc.utexas.edu |
The read
TACC's NSF-funded system, announced in July 2023 and in early use from January 2024, mixing new Xeon Max HBM nodes with retained Skylake and Ice Lake nodes and Intel and NVIDIA GPUs on Omni-Path. The NSF award record independently confirms the funding. TACC's two pages disagree with each other on the number of Intel GPUs (40 or 80) and on the Omni-Path speed (400 or 100 Gb/s), so no Intel GPU count is recorded. It has never submitted to TOP500.
Timeline
Site & facility
Texas Advanced Computing Center
- Location
- Austin, TX, USA
- Cooling
- Direct liquid cooling
- Commissioned
- 2007
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Intel GPU count: 40 GPUs in 10 Dell XE9640 servers (press release) against 80 GPUs in 20 nodes of four Max 1550 (docs). Both pages are TACC; no Intel GPU count is recorded.
- Omni-Path speed: 400 Gb/s Cornelis CN5000 (press release) against 100 Gb/s with an upgrade planned (docs). The press release may describe the target and the docs the state at the time.
Change history
- 2026-09-20 Added, funding verified against the NSF award record
Related systems
Same site
- Lonestar6 · USA, operational
- Frontera · USA, decommissioned, 2019
- Longhorn · USA, operational, 2019
- Stampede2 · USA, decommissioned, 2017
- Lonestar 5 · USA, decommissioned, 2016
- Maverick (TACC) · USA, operational, 2014
Same operator
- Horizon · USA, under construction
- Vista (TACC) · USA, operational, 2024
- Stampede · USA, decommissioned, 2013
- Lonestar 4 · USA, decommissioned, 2011
- Ranger · USA, decommissioned, 2008
Same accelerator
- Dawn · United Kingdom, operational, 2024
- Aurora · USA, operational, 2023
- Lichtenberg II Phase 2 · Germany, operational, 2023
- Clementina XXI · Argentina, operational
- SuperMUC-NG Phase 2 · Germany, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| api.nsf.gov | names system and part | Intel Data Center GPU Max 1550 |
| tacc.utexas.edu | names system, part and count | Intel Data Center GPU Max 1550, Omni-Path Architecture · counts: 96 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.