Germany · operational · mixed
HoreKa
Also known as Hochleistungsrechner Karlsruhe
Operated by Karlsruhe Institute of Technology .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 8.03 PFlop/s
- Rpeak
- 15.01 PFlop/s
- Rmax ÷ Rpeak
- 53.5%
- Cores
- -
- Power
- 358.79 kW
- Per watt
- 22.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of HoreKa, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 8.03 PFlop/s | #79 of 210 · top 37% | #17 of 95 · top 17% |
| Energy efficiency | 22.4 GF/W | #33 of 109 · top 30% | #21 of 68 · top 30% |
| Rmax ÷ Rpeak | 53.5 % | #188 of 207 · bottom 10% | #89 of 94 · bottom 6% |
| Power draw | 359 kW | #78 of 112 · bottom 32% | #42 of 69 · bottom 41% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Lenovo ThinkSystem SD650 V2 (Blue) and SD650-N V2 (Green) nodes | Lenovo | - | Reported | top500.org |
| Accelerator | - 167 HoreKa Green nodes with four NVIDIA A100 40 GB each (quantity derived as 167 x 4) | NVIDIA | 668 reported | Reported | nhr.kit.edutop500.org |
| Accelerator | - 22 HoreKa Teal nodes with four NVIDIA H100 94 GB each on AMD EPYC 9354 hosts (quantity derived as 22 x 4) | NVIDIA | 88 reported | Reported | nhr.kit.edu |
| Accelerator | NVIDIA H200 SXM Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 13 Ruby nodes with four NVIDIA HGX H200 plus one Teal node with eight H200 (quantity derived as 13 x 4 + 8) | NVIDIA | 60 reported | Reported | nhr.kit.edu |
| CPU | - 610 HoreKa Blue nodes with Intel Xeon Platinum 8368 38C 2.4 GHz (76 cores per node; quantity is nodes) | Intel | 610 reported | Verified | nhr.kit.edutop500.org |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds InfiniBand 4X HDR 200 Gb/s on all nodes | NVIDIA | - | Verified | nhr.kit.edutop500.org |
Engineering, funding and access
What HoreKa runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 167 nodesHoreKa Green partition with four NVIDIA A100 40 GB per node; HoreKa Blue has 610 CPU nodes, Teal 23 and Ruby 13 accelerated nodes | 2026 | Operator stated | nhr.kit.edu |
| Interconnect and topology | InfiniBand 4X HDR 200 Gbit/s on all nodes with about 1 microsecond latency; Teal and Ruby nodes use NDR-class linksTOP500 lists Mellanox HDR InfiniBand for Green | 2026 | Operator stated | nhr.kit.edutop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Job scheduler | Slurm batch system | 2026 | Operator stated | nhr.kit.edu |
| Programming and software stack | Red Hat Enterprise Linux 9.x with open-source cluster components | 2026 | Operator stated | nhr.kit.edu |
The read
Karlsruhe Institute of Technology's national NHR supercomputer, a Lenovo ThinkSystem SD650 V2 machine. The KIT documentation lists HoreKa Blue as 610 CPU nodes (Intel Xeon Platinum 8368, 76 cores per node) and HoreKa Green as 167 nodes with four NVIDIA A100 40 GB GPUs each (668 A100), with later Teal nodes (22 nodes with four H100 94 GB, plus one 8x H200 node) and Ruby nodes (13 nodes with four H200) added, all on 4X HDR 200 Gb/s InfiniBand. TOP500 lists the Green partition at 8.03 PFlop/s Rmax and 15.01 PFlop/s Rpeak (52nd on the June 2021 list) and Blue at 2.33 PFlop/s Rmax; the FLOPS figures in this row are the Green partition only. KIT's press release states a combined peak of 17 PFlop/s, an investment of 15 million euros and an inauguration on 2 August 2021. Both KIT and TOP500 confirm the CPU, the A100 GPUs and the InfiniBand HDR fabric.
Timeline
- 2021 First operational source
- 2021-06 Listed at #52 on the TOP500 (June 2021) source
- 2023-02 HoreKa Blue gained 8 extra-large-memory nodes with 4096 GiB each. source
- 2024-05 HoreKa Teal entered operation with 22 nodes of four NVIDIA H100 94 GB GPUs each. source
- 2025-08 HoreKa Ruby entered operation with 13 nodes of four NVIDIA H200 GPUs each. source
- 2025-10 A single 8-way NVIDIA H200 node joined HoreKa Teal. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added HoreKa (Karlsruhe Institute of Technology)
Nearby in scale
The machines closest to HoreKa by Rmax, smaller to larger.
Related systems
Same operator
- bwUniCluster 3.0 · Germany, operational, 2025
- ForHLR II · Germany, decommissioned, 2016
- HoreKa 2 · Germany, operational, 2026
- KIT AI Data Center · Germany, planned
- ForHLR I · Germany, decommissioned, 2014
- GridKa · Germany, operational, 2002
Same accelerator
- Berzelius · Sweden, operational, 2021
- Discoverer · Bulgaria, operational, 2021
- Delta · USA, operational, 2022
- Phoenix (PACE) · USA, operational, 2020
- Tinkercliffs · USA, operational, 2020
- Kempner AI Cluster · USA, operational, 2023
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA InfiniBand HDR |
| nhr.kit.edu | names system, part and count | NVIDIA H200 SXM, NVIDIA InfiniBand HDR · counts: 60 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Related news
- Germany’s Karlsruhe Institute of Technology unveils 33 petaflops HoreKa 2 supercomputer · Data Center DynamicsKIT's HoreKa 2 goes operational as the successor to the HoreKa system already tracked in this graph, roughly doubling peak performance to 33 petaflops on a Lenovo-built hybrid of AMD Epyc Turin CPUs and Nvidia GB200 GPUs. A concrete data point for how NHR centers refresh hardware generations, and reason to update HoreKa's own system entry with the newer configuration.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.