COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Gadi

Australia · operational · hpc

Gadi

Operated by NCI Australia at NCI Australia (Canberra) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
9.26 PFlop/s
HPL measured
Rpeak
15.14 PFlop/s
Rmax ÷ Rpeak
61.2%
Cores
204,032
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Gadi, and those in Australia. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax9.26 PFlop/s#55 of 213 · top 25%#3 of 12 · top 18%
Rmax ÷ Rpeak61.2 %#171 of 209 · bottom 19%#12 of 12 · bottom 1%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Fujitsu, with Lenovo
Fujitsu - Verified info.archives.global.fujitsutop500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
NVIDIA V100 GPU nodes
NVIDIA - Reported info.archives.global.fujitsutop500.org
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Mellanox HDR InfiniBand, Dragonfly+ topology
NVIDIA - Reported info.archives.global.fujitsu
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
warm-water direct liquid cooling
Fujitsu - Verified info.archives.global.fujitsunci.org.au
Operating system CentOS
Operating systems
Linux distribution, RHEL-compatible rebuild · Open source, community-maintained
CentOS
The CentOS Project
IBMNYSE rolls up to IBM
- Reported top500.org

Engineering, funding and access

What Gadi runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes3,200 nodesFujitsu PRIMERGY CX2570 M5 servers with second-generation Xeon Platinum and V100 GPUs2019-07-29Operator statedinfo.archives.global.fujitsu
Interconnect and topologyMellanox HDR InfiniBand in a Dragonfly+ topology, 200 Gb/sTOP500 lists Mellanox HDR InfiniBand2019-07-29Operator statedinfo.archives.global.fujitsutop500.org
Cooling designFujitsu and Lenovo Neptune direct liquid cooling with warm water2019-07-29Operator statedinfo.archives.global.fujitsu

Software

ItemDetailAs ofBasisSource
Parallel filesystemDDN Lustre parallel file system over clustered NetApp storage arrays2019-07-29Operator statedinfo.archives.global.fujitsu
Job schedulerAltair PBS Works Suite2019-07-29Operator statedinfo.archives.global.fujitsu
Programming and software stackCentOS operating system2026-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funded byAustralian Government, through NCRIS, with AUD 70 million of funding for the upgradeFujitsu gives the amount in Australian dollars2019-07-29Operator statedinfo.archives.global.fujitsu
ProcurementFujitsu with Lenovo, Intel, NVIDIA, NetApp, Mellanox, DDN, Altair and APC by Schneider Electric; announced 29 July 2019 to replace Raijin2019-07-29Operator statedinfo.archives.global.fujitsu

The read

Australia's national supercomputer at NCI, built by Fujitsu and Lenovo on Intel Cascade Lake with NVIDIA V100 GPUs, announced in July 2019 with a A$70 million government grant and ranked 24th in June 2020. NCI and Fujitsu independently name the vendors, the NetApp and DDN Lustre storage and the warm-water cooling, so those edges are verified. Fujitsu's release said it would go live in November 2019 while NCI says it launched in 2020, so 2020 is recorded. Rmax rests on TOP500 alone.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

NCI Australia (Canberra)

Location
Canberra, Australia
Commissioned
2019

Change history

Nearby in scale

The machines closest to Gadi by Rmax, smaller to larger.

Same site

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
info.archives.global.fujitsunames system and partNVIDIA InfiniBand HDR, Direct liquid cooling, warm water
top500.orgnames system and partNVIDIA Tesla V100, NVIDIA InfiniBand HDR, CentOS

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading