Germany · decommissioned · hpc

CLAIX-2018

Operated by RWTH Aachen University .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.48 PFlop/s
HPL measured
Rpeak
4.11 PFlop/s
Rmax ÷ Rpeak
60.3%
Cores
61,200
Power
692.05 kW
Per watt
3.6 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of CLAIX-2018, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax2.48 PFlop/s#108 of 223 · top 48%#44 of 95 · top 46%
Energy efficiency3.6 GF/W#83 of 133 · bottom 39%#37 of 68 · bottom 47%
Rmax ÷ Rpeak60.3 %#174 of 216 · bottom 21%#81 of 94 · bottom 15%
Power draw692 kW#61 of 137 · top 44%#25 of 69 · top 35%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
NEC cluster
NEC - Reported top500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
48 nodes with two NVIDIA Volta V100 GPUs each, NVLink
NVIDIA 96
reported
Reported itc.rwth-aachen.de
CPU Intel Xeon Platinum 8160
CPUs
x86-64 · 24C · 2.1 GHz · 14 nm · 150 W
Xeon Platinum 8160 24C 2.1GHz, 61,200 cores per TOP500
Intel - Verified top500.orgitc.rwth-aachen.de
Interconnect Omni-Path Architecture
Interconnect
Fat tree · 100 Gb/s per port · About 1 microsecond
Intel Omni-Path 100G
Intel - Verified top500.orgitc.rwth-aachen.de

Engineering, funding and access

What CLAIX-2018 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes1,100 nodesAround 1,100 compute nodes with two Xeon Platinum 8160 and 192 GB each, plus 48 GPU nodes with two NVIDIA V100 linked by NVLink.2019-06-26Operator stateditc.rwth-aachen.de
Storage capacity10 PB2019-06-26Operator stateditc.rwth-aachen.de
Interconnect and topologyIntel Omni-Path 100G2019-06-26Operator stateditc.rwth-aachen.detop500.org

Software

ItemDetailAs ofBasisSource
Parallel filesystemLustre, 10 PB at 150 GB/s read and write, with a network link to the first CLAIX stage2019-06-26Operator stateditc.rwth-aachen.de
Programming and software stackCentOSTOP500 list entry2019-06Operator statedtop500.org

The read

RWTH Aachen's NEC-built CLAIX-2018 cluster, 92nd on the June 2019 TOP500 and 51st on the Green500. TOP500 lists 61,200 cores of Xeon Platinum 8160 24-core 2.1 GHz on Intel Omni-Path with 2.48 PFlop/s Rmax and 4.11 PFlop/s Rpeak; the IT Center's own announcement describes around 1,100 nodes with the same CPU, 48 GPU nodes with two NVIDIA Volta V100 each, a 10 PB Lustre system, and a theoretical 3.55 PFlop/s for the second stage, so the peak figures disagree and the TOP500 values are used. RWTH's IT Center blog says CLAIX-2018 reached end of life, with 516 nodes switched off on 3 May 2024 and the rest on 31 May 2024. The later CLAIX-2023 is a separate row.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to CLAIX-2018 by Rmax, smaller to larger.

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

One cited source was readable and does not mention this system; another could not be read because the host returned a bot challenge. The unreadable one may well be fine, so this is weaker evidence than a corroborated row and much stronger than an unsupported one. See how this check works.

Cited sourceResultFound on the page
itc.rwth-aachen.decould not be fetched-
top500.orgdoes not name this systemIntel Xeon Platinum 8160, Omni-Path Architecture · counts: 96

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.