Switzerland · operational · mixed
Euler
Operated by ETH Zurich at ETH Zurich Scientific IT Services Data Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W 8x NVIDIA Tesla A100 (40GB) per node, 3 nodes | NVIDIA | 3 reported | Reported | docs.hpc.ethz.ch |
| CPU | AMD EPYC 7763 (Milan) CPUs x86-64 · 64C · 2.45 GHz · 7 nm · 280 W Euler VII Phase 2: dual AMD EPYC 7763, 64 cores/socket, 248 nodes | AMD | 248 reported | Reported | docs.hpc.ethz.ch |
| CPU | AMD EPYC 7742 (Rome) CPUs x86-64 · 64C · 2.25 GHz · 7 nm · 225 W Euler VI: dual AMD EPYC 7742, 64 cores/socket, 216 nodes | AMD | 216 reported | Reported | docs.hpc.ethz.ch |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds 100 Gb/s InfiniBand HDR fabric (most CPU node generations) | NVIDIA | - | Reported | docs.hpc.ethz.ch |
Engineering, funding and access
What Euler runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | 100/25/10 Gb/s Ethernet between storage, compute and login nodes; InfiniBand HDR (100 Gb/s to nodes, 200 Gb/s between switches) within Euler VI and VII; 100 Gb/s InfiniBand EDR within Euler IVEuler is reachable only from the ETH network or via VPN | 2026 | Operator stated | docs.hpc.ethz.ch |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre scratch on NVMe SSD and Lustre work on HDD; NFS v3 home on NVMe and project on HDD with SSD caching; node-local XFS tmpScratch quota 2.5 TB per user with old files purged after about two weeks; home 50 GB per user; project and work capacity depends on the shareholder group | 2026 | Operator stated | docs.hpc.ethz.ch |
| Job scheduler | SlurmThe documentation's batch-system section is Slurm, and node-local tmp is deleted when the Slurm job ends | 2026 | Operator stated | docs.hpc.ethz.ch |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Shareholding ETH research groups, institutes and departments, plus ETH's own public shareETH states that Euler is financed by its shareholders | 2026 | Operator stated | docs.hpc.ethz.ch |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Shareholder model: research groups, institutes and departments buy shares and use resources in proportion to their investment under a service level agreement; a public share gives all ETH members free, non-guaranteed use of up to 48 CPU cores and 128 GiB RAM, without GPUsGroup membership is managed by each department's IT Services Group | 2026 | Operator stated | docs.hpc.ethz.ch |
| Access page | docs.hpc.ethz.ch/users/shareholdersShares are requested through the ETH IT request form linked from this page | 2026 | Operator stated | docs.hpc.ethz.ch |
The read
ETH Zurich's central HPC cluster, operated by its Scientific IT Services group and distinct from CSCS in Lugano, which separately runs the Alps and (formerly) Piz Daint systems already in this dataset. ETH's own hardware documentation gives a full generation history: Euler I (purchased end of 2013, operational 2014-2018) through Euler IX (first phase January 2024, second phase planned January 2026), with CPU generations moving from dual AMD EPYC 7742 (Euler VI, 216 nodes, 2020-present) and dual EPYC 7H12/7763 (Euler VII, two phases, 2021-2022-present, 292 and 248 nodes respectively) to dual EPYC 9654 (Euler IX, 372 nodes). GPU nodes are funded by individual research-group 'shareholders' rather than centrally, and span NVIDIA Quadro RTX 6000, TITAN RTX, RTX 2080 Ti, RTX 3090, RTX 4090, RTX PRO 6000 and Tesla A100 (40 GB and 80 GB), plus 6 experimental AMD MI300A APU nodes with shared HBM3. Most CPU generations connect over 100 Gb/s InfiniBand HDR (Euler VIII instead uses 100 Gb/s Ethernet). No aggregate current core count or FLOPS figure was found on a page this research could actually fetch (the cluster's own top-level wiki page and homepage give only prose descriptions), so cores, rmax_pflops and rpeak_pflops stay blank rather than repeating an unsourced aggregate. Both sources fetched here are ETH Zurich's own hardware documentation, so confidence stays reported; no independent vendor case study was found.
Timeline
- 2014 First operational source
- 2017 Euler III, purchased at the end of 2016, entered operation (it ran until 2022) source
- 2018 Euler IV, purchased at the end of 2017, entered operation (it ran until 2022) source
- 2018 Euler V was purchased in fall 2018 to replace Euler I and stayed in operation until July 2023 source
- 2020 Euler VI, purchased at the end of 2019, entered operation at the beginning of 2020 source
- 2021-01 The first phase of Euler VII entered operation, followed by a second phase in January 2022 source
- 2023 Euler VIII, installed at the end of 2022, entered operation at the beginning of 2023 source
- 2024-01 The first phase of Euler IX entered operation, with a second phase planned for January 2026 source
Site & facility
ETH Zurich Scientific IT Services Data Center
- Location
- Zurich, Switzerland
- Commissioned
- 2014
Change history
- 2026-09-24 Euler added
Related systems
Same site
- Euler I-II · Switzerland, decommissioned, 2014
Same operator
- Brutus · Switzerland, operational, 2008
Same accelerator
- Betzy · Norway, operational, 2020
- Jetstream2 · USA, operational
- JURECA-DC · Germany, operational, 2020
- JUWELS Booster · Germany, operational, 2020
- Lyapunov · Russia, operational, 2020
- PARAM Siddhi-AI · India, operational, 2020
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.hpc.ethz.ch | names system only | · counts: 3 |
| docs.hpc.ethz.ch | names system, part and count | NVIDIA A100 SXM4 40GB · counts: 248, 3 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.