Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell-integrated cluster, 27 racks | Dell Technologies | - | Reported | sdsc.edusdsc.edu |
| Accelerator | NVIDIA Tesla P100 Accelerators CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W 36 nodes of four NVIDIA P100 added in 2017 | NVIDIA | 144 reported | Verified | sdsc.edutop500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond Mellanox FDR InfiniBand, full bisection per 72-node rack | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Verified | sdsc.edutop500.org |
Engineering, funding and access
What Comet runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,944 nodes27 racks of 72 compute nodes; NSF's outcomes report adds 72 GPU nodes (36 with four K80, 36 with four P100) and 4 large-memory nodes of 1.5 TB. | 2015-04-29 | Operator stated | sdsc.eduapi.nsf.gov |
| Total memory | 243 TBDerived: 1,944 compute nodes x 128 GB = 248,832 GB, about 243 TiB, excluding GPU and large-memory nodes. | 2015-04-29 | Operator stated | sdsc.edu |
| Storage capacity | 7.6 PB | 2015-04-29 | Operator stated | sdsc.edu |
| Interconnect and topology | Mellanox FDR InfiniBand, full bisection within each 72-node rack and 4:1 oversubscription between racks | 2015-04-29 | Operator stated | sdsc.edu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre (an evolution of SDSC's Data Oasis), 7.6 PB at 200 GB/s, with scratch, allocated persistent space and a nearline replica | 2015-04-29 | Operator stated | sdsc.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Science Foundation, award 1341698 (Gateways to Discovery: Cyberinfrastructure for the Long Tail of Science)SDSC valued the award at $21.6 million including hardware and operating funds; the NSF record shows a $12 million estimated total and $27.3 million obligated. | 2013-10-01 | Operator stated | api.nsf.govsdsc.edu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | XSEDE allocations from May 2015 to July 2021, with individual PIs capped at 10 million core-hours and science gateways at 20 million | 2021-07 | Operator stated | api.nsf.govsdsc.edu |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2015 to 2021: ran over 28 million jobs, more than 2 billion core-hours and 13 million GPU-hours for over 100,000 unique users, supporting over 2,000 publicationsOutcomes reported in the NSF award record. | 2021-07 | Operator stated | api.nsf.gov |
The read
SDSC's NSF-funded Dell cluster of 1,944 dual-Haswell nodes on FDR InfiniBand, aimed at the long tail of science and the first XSEDE system with production virtualization. SDSC says early operations began in April 2015; 144 K80 GPUs were later joined by 144 P100s for 288 in all. SDSC and the NSF award record independently confirm the funding, but they disagree on the dollar figure, so none is recorded. SDSC planned to end service in March 2021, the NSF record runs to July 2021, and a later Globus post calls it officially retired, so only the year is recorded. We found no TOP500 entry for it, so there is no rank pointer, and SDSC's claims of 'more than two petaflops' against the NSF's 2.8 peak (with 48,784 cores against SDSC's 46,656 CPU cores) describe different eras, so no peak or core count is recorded.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- End of service: end of NSF service March 2021 (SDSC) against 75-month operating period to July 2021 (NSF award record). A later Globus post says Comet was retired by August 2021; only the year is recorded.
- NSF funding amount: $21.6 million (SDSC) against $27.3 million total, $12 million initial (NSF award record). The award grew through supplements; no figure is recorded.
Change history
- 2026-09-20 Added as an unranked NSF-funded system; end-of-service date disputed
Related systems
Same site
- Gordon · USA, decommissioned, 2012
- Expanse · USA, operational, 2020
- Trestles (SDSC) · USA, decommissioned, 2010
- Voyager · USA, operational, 2022
- Cosmos (SDSC) · USA, operational, 2025
- DataStar · USA, decommissioned, 2004
Same operator
- Expanse2 · USA, planned
- Intimidata · USA, operational, 2004
- Blue Horizon · USA, decommissioned, 2000
Same accelerator
- DGX SaturnV · USA, upgraded, 2016
- GOSAT-2 RCF2 · Japan, operational, 2016
- Lomonosov-2 · Russia, operational, 2014
- Owens · USA, decommissioned, 2016
- AIST AI Cloud · Japan, operational, 2017
- Cedar (SFU) · Canada, decommissioned, 2017
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| api.nsf.gov | names system and part | Mellanox InfiniBand FDR |
| sdsc.edu | names system and part | Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.