Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 6.22 PFlop/s
- Rpeak
- 7.47 PFlop/s
- Rmax ÷ Rpeak
- 83.3%
- Cores
- 122,880
- Power
- 967.43 kW
- Per watt
- 6.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Genkai, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 6.22 PFlop/s | #159 of 234 · bottom 33% | #33 of 131 · top 25% |
| Energy efficiency | 6.4 GF/W | #103 of 121 · bottom 16% | #29 of 74 · top 38% |
| Rmax ÷ Rpeak | 83.3 % | #56 of 231 · top 24% | #45 of 130 · top 34% |
| Power draw | 967 kW | #50 of 126 · top 39% | #26 of 74 · top 34% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Fujitsu PRIMERGY CX2550 M7 (Node Group A) | Fujitsu | - | Reported | top500.org |
| Accelerator | - NVIDIA H100: four per node on 38 Node Group B nodes plus eight per node on two Node Group C nodes | NVIDIA | 168 estimated | Reported | cc.kyushu-u.ac.jp |
| CPU | - Intel Xeon Platinum 8490H 60C 1.9GHz, 1,024 CPU-only nodes in Node Group A | Intel | - | Reported | top500.orgcc.kyushu-u.ac.jp |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds InfiniBand NDR200/NDR400 full-bisection fat tree | NVIDIA | - | Reported | cc.kyushu-u.ac.jptop500.org |
Engineering, funding and access
What Genkai runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand NDR200Node Group A, the Fujitsu PRIMERGY CX2550 M7 CPU partition listed on TOP500 | 2026-06 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Rocky Linux operating system | 2026-06 | Operator stated | top500.org |
| Programming and software stack | Intel oneAPI 2023.1.0 compiler, Intel MKL 2023.1.0 and Intel MPI 2021.9.0 (HPL run configuration) | 2026-06 | Operator stated | top500.org |
The read
Kyushu University's supercomputer on the Ito Campus, in service from October 2024 after test operation from July, with users migrating from the earlier ITO system. Node Group A is 1,024 CPU-only nodes with Intel Xeon Platinum 8490H (60-core) processors, Node Group B is 38 nodes with four NVIDIA H100 GPUs each, and Node Group C is two nodes with eight H100 each, all on InfiniBand NDR200/NDR with 55.2 PB of HDD and 737.28 TB of SSD storage. TOP500 lists only Node Group A: 122,880 cores, Rmax 6.22 and Rpeak 7.47 PFlop/s at 967.43 kW, 178th on its November 2024 debut and 238th in November 2025. Kyushu quotes 7.76 PFlop/s CPU and 5.63 PFlop/s GPU double-precision for the whole system, so the figures here are the CPU partition's. TOP500 is the only source for Rmax and core count, so the tier is reported.
Timeline
- 2024-10 First operational source
- 2024-11 Genkai Node Group A debuted at rank 178 on the November 2024 TOP500 at 6.22 PFlop/s, falling to rank 262 by June 2026. source
- 2025-11 Listed at #238 on the TOP500 (November 2025) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Genkai added, from TOP500 and Kyushu University
Nearby in scale
The machines closest to Genkai by Rmax, smaller to larger.
- JUWELS Cluster · Germany, operational · 6.18 PFlop/s
- SQUID · Japan, operational · 6.11 PFlop/s
- Lockhart TDS · USA, operational · 6.06 PFlop/s
- Onyx (ERDC) · USA, operational · 6.32 PFlop/s
- SPR-HBM · USA, operational · 6.46 PFlop/s
- MareNostrum 4 · Spain, decommissioned · 6.47 PFlop/s
Related systems
Same site
- ITO Subsystem A · Japan, decommissioned, 2018
Same operator
- QUARTETTO · Japan, operational, 2013
- Kyushu FX10 · Japan, operational, 2012
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA InfiniBand NDR (Quantum-2) |
| cc.kyushu-u.ac.jp | names system and part | NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.