Supercomputers/Systems/Polaris Forge 1 (Ellendale)

USA · operational · ai training

Polaris Forge 1 (Ellendale)

Also known as Applied Digital Polaris Forge 1

Operated by CoreWeave at Applied Digital Polaris Forge Campus (Ellendale) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Applied Digital builds and leases the 400 MW contracted Polaris Forge 1 campus to CoreWeave
Applied Digital - Reported ir.applieddigital.com
Cooling -
Proprietary waterless liquid cooling with near-zero water consumption
Applied Digital - Reported ir.applieddigital.com

Engineering, funding and access

What Polaris Forge 1 (Ellendale) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designApplied Digital's proprietary waterless liquid cooling; design details are not published2025-11-24Operator statedir.applieddigital.com

Funding

ItemDetailAs ofBasisSource
Funded byMacquarie Asset Management preferred equity facility of up to $5.0 billion for Polaris Forge 1 and 2, with $900 million drawn by January 2026Applied Digital says it can keep over 85% common equity of each site.2026-01-07Regulatory filingir.applieddigital.com
Funded by$2.35 billion of 9.25% senior secured notes due 2030, issued at 97% of par by a special purpose subsidiary (Morgan Stanley lead), funding ELN-02 and ELN-03 and repaying the SMBC loan2026-01-07Regulatory filingir.applieddigital.com
ProcurementCoreWeave holds 400 MW under contract at the campus (about $11 billion of prospective lease revenue); buildings of 100 MW, 150 MW and 150 MWCoreWeave paid about $85.0 million in the quarter, including $73.0 million for tenant fit-out.2026-01-07Regulatory filingir.applieddigital.comir.applieddigital.com

Access

ItemDetailAs ofBasisSource
How researchers get timeEntire campus leased to CoreWeave, which resells the capacity as GPU cloudApplied Digital provides powered, cooled data center space and CoreWeave supplies the GPUs; no GPU count has been disclosed.2025-11-24Operator statedir.applieddigital.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 36,900 accelerators 2025-11-24 Third-party estimate Epoch AI chip estimate, latest per chip type (B200); some rows are company disclosures, others modelled. epoch.ai
Stated investment 2.6 USD bn 2026-06-30 Third-party estimate Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. epoch.ai
IT power 250 MW 2026-10-02 Operator stated Applied Digital (2 Oct 2026): additional 75 MW online, 250 MW critical IT now online at Polaris Forge 1 (100 MW building 1 plus 150 MW building 2 phases). ir.applieddigital.com
IT power 400 MW 2025-06 Design target Applied Digital: Polaris Forge 1 described with 400 MW of critical IT load (over 1 GW in load study). Campus design figure, not all built. ir.applieddigital.com
PUE 1.18 2025-06 Design target Applied Digital: Polaris Forge 01 design with closed-loop direct-to-chip cooling projected to reach PUE 1.18 and WUE near zero; projection, not measured ir.applieddigital.com

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

Applied Digital's liquid-cooled AI factory campus in Ellendale, North Dakota, leased in full to CoreWeave: three buildings of 100 MW, 150 MW and 150 MW for 400 MW contracted (about 11 billion dollars of lease revenue), on a campus engineered to reach 1 GW. Applied Digital announced Ready for Service for Building 1 (ELN-02) at 50 MW in October 2025 and at the full 100 MW in November 2025, and its January 2026 earnings release reports ELN-02 fully operational; the second 150 MW building was under construction with a mid-2026 target and the third is due in 2027. CoreWeave is recorded as operator because it is the named tenant, following the same convention as the Stargate Abilene row, while Applied Digital is the builder and landlord. Both cited pages are Applied Digital's own, so the tier is reported. No source states the GPU model or count CoreWeave installs there, so no accelerator quantity is recorded and power is blank since the 100 MW figure is critical IT capacity, not a measured draw.

Timeline

  • 2025-05 Announced source
  • 2025-10 First operational source
  • 2025-11-24 Applied Digital reaches Ready for Service on the second 50 MW phase, bringing Building 1 (ELN-02) to its full 100 MW critical IT load source
  • 2026-01-07 Applied Digital reports completing a $2.35 billion senior secured notes offering to fund Buildings 1 and 2 and repay the SMBC loan source

Site & facility

Applied Digital Polaris Forge Campus (Ellendale)

Location
Ellendale, ND, USA
Cooling
Proprietary waterless liquid cooling
Commissioned
2025

Change history

Nearby in scale

The machines closest to Polaris Forge 1 (Ellendale) by accelerator count, smaller to larger.

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
ir.applieddigital.comnames system only-
ir.applieddigital.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.