Supercomputers/Systems/Fire-Flyer 2
China · operational · ai training
Fire-Flyer 2
Operated by High-Flyer at High-Flyer (undisclosed site, China) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | - 10,000 NVIDIA A100 PCIe 40GB GPUs across approximately 1,250 eight-GPU compute nodes | NVIDIA | 10,000 reported | Reported | arxiv.orghigh-flyer.cn |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds 122 Mellanox QM8700 (40-port) 200Gbps InfiniBand switches in a two-layer, storage-and-compute-integrated fat tree, versus the 1,320 switches an equivalent three-layer DGX-A100 topology would need; one 200Gbps ConnectX-6 NIC per 8-GPU node. | NVIDIA | 122 reported | Reported | arxiv.org |
Engineering, funding and access
What Fire-Flyer 2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,250 nodesApproximately 1,250 GPU compute nodes, each with 8 PCIe A100 40GB GPUs, two 32-core AMD EPYC CPUs and 512 GB of DDR4 | 2024-08 | Operator stated | arxiv.org |
| Storage capacity | 22.5 PBOver 20 PiB across 180 storage nodes with 2,880 NVMe SSDs, converted to PB | 2024-08 | Operator stated | arxiv.org |
| Interconnect and topology | Two-zone two-layer fat-tree InfiniBand of 122 Mellanox QM8700 200 Gb/s switches, one ConnectX-6 200 Gb/s NIC per nodeThe paper compares 122 switches with 1,320 for a three-layer DGX-style design | 2024-08 | Operator stated | arxiv.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | 3FS parallel file system, with a measured total read throughput of 8 TB/sTheoretical outbound bandwidth is 9 TB/s | 2024-08 | Operator stated | arxiv.orghigh-flyer.cn |
| Job scheduler | HAI Platform time-sharing scheduler that interrupts and resumes tasks via checkpoints and allocates GPUs by nodeHigh-Flyer's history page describes task-level time-sharing scheduling | 2024-08 | Operator stated | arxiv.orghigh-flyer.cn |
| Programming and software stack | HFReduce in-house allreduce library, used alongside NCCL | 2024-08 | Operator stated | arxiv.org |
| Programming and software stack | HaiScale parallelism library supporting DP, PP, TP, EP, FSDP and ZeRO | 2024-08 | Operator stated | arxiv.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Built in-house by High-Flyer: PCIe A100 nodes at about 60 percent of a DGX-A100 node's price for 80 to 83 percent of its performance; High-Flyer's history page puts Fire-Flyer II at one billion yuanYuan figure not converted to USD | 2024-08 | Operator stated | arxiv.orghigh-flyer.cn |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Performance approaching a DGX-A100 system at about half the cost and 40 percent less energy (SC24 paper, 2024) | 2024-08 | Operator stated | arxiv.org |
| Notable result | HAI Platform ran 1.35 million tasks totalling 56.74 million GPU hours at an average occupancy of 96 percent or moreHigh-Flyer's history page gives no explicit dates | 2024 | Operator stated | high-flyer.cn |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 10,000 accelerators | 2024-08 | Operator stated | PCIe A100 GPUs (about 1,250 nodes) per the High-Flyer Fire-Flyer 2 paper. Paper reports 40% lower energy than DGX-A100 but no PUE or MW. | arxiv.org |
The read
Fire-Flyer 2 is the second-generation AI-HPC cluster built by High-Flyer, a Chinese quantitative hedge fund, to train the deep-learning models behind its trading strategies; the same infrastructure and software stack later underpinned the DeepSeek language-model lab that High-Flyer spun out. High-Flyer's own research team published a detailed account accepted at SC24 ('Fire-Flyer AI-HPC: A Cost-Effective Software-Hardware Co-Design for Deep Learning', arXiv:2408.14158): 10,000 PCIe A100 40GB GPUs across roughly 1,250 eight-GPU nodes, a two-layer fat-tree InfiniBand fabric built from 122 Mellanox QM8700 200Gbps switches (versus the 1,320 switches an equivalent three-layer DGX-A100 topology would need) with one 200Gbps ConnectX-6 NIC per node, and a 3FS parallel filesystem across 180 storage nodes with over 20 PiB of NVMe capacity. The paper states total power draw of roughly 3+ MW for the GPU nodes, under 4 MW including network switches; because it gives a range rather than a single figure, power_kw is left blank here rather than picking a point estimate. High-Flyer's own company history page corroborates the 10,000-GPU figure and a stated 1 billion yuan cost, and dates the cluster to 2021, following the smaller, since-retired Fire-Flyer 1 (2020, roughly 1,100 GPUs; not recorded as a separate row here given inconsistent GPU counts for it across sources). No TOP500/HPL submission exists for this cluster.
Timeline
- 2021 First operational source
Site & facility
Change history
- 2026-10-04 Added AI datacenter metrics for fire-flyer-2
- 2026-09-27 Added Fire-Flyer 2 (High-Flyer, China)
Nearby in scale
The machines closest to Fire-Flyer 2 by accelerator count, smaller to larger.
- Microsoft Azure OpenAI supercomputer (2020) · USA, operational · 10,000 accelerators
- Equinox · USA, planned · 10,000 accelerators
- Google TPU 8t superpod · USA, planned · 9,600 accelerators
- Industrial AI Cloud · Germany, operational · 10,000 accelerators
- Lambda Kansas City AI Factory · USA, under construction · 10,000 accelerators
- China Telecom Shaoguan Zhenwu Cluster · China, operational · 10,000 accelerators
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| arxiv.org | names system only | - |
| high-flyer.cn | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.