Supercomputers/Systems/davinci-2
Italy · operational · mixed
davinci-2
Operated by Leonardo S.p.A. at Leonardo Fiumara Tower (Genoa) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 14.21 PFlop/s
- Rpeak
- 20.64 PFlop/s
- Rmax ÷ Rpeak
- 68.8%
- Cores
- 43,776
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of davinci-2, and those in Italy. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 14.21 PFlop/s | #93 of 202 · top 46% | #7 of 21 · top 30% |
| Rmax ÷ Rpeak | 68.8 % | #124 of 199 · bottom 39% | #11 of 20 · bottom 48% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray XD670 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | NVIDIA H200 SXM Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W NVIDIA H200 SXM5 141GB | NVIDIA | - | Reported | top500.org |
| CPU | - Intel Xeon Platinum 8568Y+ 48C 2.3GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR400 | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What davinci-2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand NDR400 | 2025-11 | Operator stated | top500.org |
The read
The 2025 upgrade to Leonardo SpA's davinci-1, installed at the same Genoa (Fiumara Tower) site rather than replacing it: Leonardo's own hpc.leonardo.com page describes both as part of one Hypercomputing Continuum with davinci-2 as its current operational hub. TOP500 lists it as an HPE Cray XD670 system of Intel Xeon Platinum 8568Y+ CPUs and NVIDIA H200 SXM5 141GB GPUs on InfiniBand NDR400, 43,776 cores, Rmax 14.21 PFlop/s and Rpeak 20.64 PFlop/s, first appearing on the November 2025 list at rank 123 and still listed at rank 142 in June 2026. Leonardo's own page separately states the upgrade reaches up to 27 PFlop/s Rpeak and 20 PFlop/s Rmax across more than 350 nodes (over 230 CPU and 120 GPU nodes), a vendor-rounded figure close to but not identical to TOP500's measured numbers, the same kind of rounding gap already noted elsewhere in this dataset between Eni's own HPC6/HPC7 statements and TOP500's Linpack figures. No power draw was found in either source, and neither source names the exact HPE/NVIDIA hardware edge independently of the other, so the individual component rows stay at reported tier even though the system-level facts (name, site, 2025 timing, approximate performance) are corroborated by both TOP500 and Leonardo.
Timeline
- 2025 First operational source
- 2025-11 Listed at #123 on the TOP500 (November 2025) source
- 2025-11 davinci-2 debuted at rank 123 on the November 2025 TOP500 at 14.21 PFlop/s source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-01 Added davinci-2 (Leonardo SpA)
Nearby in scale
The machines closest to davinci-2 by Rmax, smaller to larger.
- ASPIRE 2A+ · Singapore, operational · 14.2 PFlop/s
- Cori · USA, decommissioned · 14.02 PFlop/s
- Nurion · South Korea, operational · 13.93 PFlop/s
- Santos Dumont · Brazil, operational · 14.29 PFlop/s
- Virga · Australia, operational · 14.94 PFlop/s
- Hopper NUS · Singapore, operational · 15.05 PFlop/s
Related systems
Same site
- davinci-1 · Italy, operational, 2020
Same accelerator
- ABCI 3.0 · Japan, operational, 2025
- AI-Farabium · Kazakhstan, operational, 2025
- Alem.Cloud · Kazakhstan, operational, 2025
- AzInTelecom Supercomputer Center · Azerbaijan, operational
- Cannon2-H200 · USA, operational, 2025
- FPT AI Factory Japan · Japan, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.leonardo.com | names system only | - |
| top500.org | names system and part | NVIDIA H200 SXM, NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.