Supercomputers/Systems/Baskerville
United Kingdom · decommissioned · mixed
Baskerville
Also known as Baskerville Tier 2
Operated by University of Birmingham at University of Birmingham (Baskerville) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 2.34 PFlop/s
- Rpeak
- 4.34 PFlop/s
- Rmax ÷ Rpeak
- 53.9%
- Cores
- 26,208
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Baskerville, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 2.34 PFlop/s | #178 of 210 · bottom 16% | #13 of 44 · top 28% |
| Rmax ÷ Rpeak | 53.9 % | #184 of 207 · bottom 12% | #38 of 44 · bottom 15% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Lenovo ThinkSystem nodes (TOP500 lists SR670 V2), with OCF as technology partner | Lenovo | - | Reported | top500.orgblog.bham.ac.uk |
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W 184 NVIDIA A100 GPUs on HGX quad boards (46 nodes x 4) | NVIDIA | 184 reported | Reported | blog.bham.ac.uk |
| CPU | - Intel Xeon Platinum 8360Y 36C 2.4GHz (Ice Lake) | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds Infiniband HDR | NVIDIA | - | Reported | top500.org |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid Lenovo Neptune direct-to-node warm water cooling | Lenovo | - | Reported | blog.bham.ac.uk |
Engineering, funding and access
What Baskerville runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 5.5 PB5 PB of spinning disk plus 0.5 PB of flash = 5.5 PB | 2021-09 | Operator stated | blog.bham.ac.uk |
| Cooling design | Lenovo Neptune direct-to-node warm-water cooling; each A100 GPU draws 400 W and a single rack has a potential draw of 76 kW | 2021-09 | Operator stated | blog.bham.ac.uk |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Software built with EasyBuild, reusing tooling developed for the University's BlueBEAR service | 2021-09 | Operator stated | blog.bham.ac.uk |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Engineering and Physical Sciences Research Council (EPSRC), part of UK Research and Innovation | 2021-09 | Operator stated | baskerville.ac.ukblog.bham.ac.uk |
| Funding programme | EPSRC Tier 2 HPC and World Class Labs initiativesThe September 2026 BEAR blog says the Tier 2 system's funding ended in March 2026 | 2021-09 | Operator stated | blog.bham.ac.ukblog.bham.ac.uk |
| Procurement | Built with technology partners OCF, Lenovo, NVIDIA and Intel; Birmingham says it was the first UK site to install NVIDIA HGX boards carrying four A100 GPUs | 2021-09 | Operator stated | blog.bham.ac.uk |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | EPSRC Access to HPC allocations for UK researchers, alongside pilot users and University of Birmingham usersAt launch, pilot users and Access to HPC researchers, including a group at Imperial College London, were on the system | 2021-09 | Operator stated | blog.bham.ac.uk |
The read
EPSRC-funded Tier 2 accelerated computing facility at the University of Birmingham, built with the Rosalind Franklin Institute, the Alan Turing Institute and Diamond Light Source. Birmingham's launch post (14 September 2021) describes 184 NVIDIA A100 GPUs on NVIDIA HGX quad boards with Intel Ice Lake CPUs, Lenovo Neptune warm-water direct-to-node cooling, and 5 PB of disk plus 0.5 PB of flash; funding was agreed in October 2020 and pilot users started in June 2021. TOP500 lists it as a Lenovo ThinkSystem with Xeon Platinum 8360Y 36C and A100 over InfiniBand HDR, 26,208 cores, Rmax 2.34 PFlop/s and Rpeak 4.34 PFlop/s; it ranked 445th on the June 2024 list and 490th on the November 2024 list. Baskerville's current hardware page also lists a newer B200 partition, which is not counted here. The University of Birmingham's BEAR blog (https://blog.bham.ac.uk/bear/2026/09/08/bear-infrastructure-improvements-in-2026/) says Baskerville was decommissioned after its funding came to an end in March 2026.
Timeline
- 2020-10 Announced source
- 2021-04 Early-ship Baskerville compute systems arrived at the University of Birmingham source
- 2021-09 First operational source
- 2024-06 Listed at #445 on the TOP500 (June 2024) source
- 2026 Birmingham's research computing team decommissioned the Baskerville Tier 2 system after its funding came to an end in March 2026 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
University of Birmingham (Baskerville)
- Location
- Birmingham, United Kingdom
- Cooling
- Direct liquid cooling, warm water
- Commissioned
- 2021
Change history
- 2026-11-08 Baskerville marked decommissioned
- 2026-10-02 Added Baskerville, Birmingham's A100 Tier 2 system, 445th on the June 2024 TOP500
Nearby in scale
The machines closest to Baskerville by Rmax, smaller to larger.
- Ares · Poland, operational · 2.34 PFlop/s
- Champollion · France, operational · 2.32 PFlop/s
- Makman-3 · Saudi Arabia, operational · 2.32 PFlop/s
- NVIDIA DGX SuperPOD (A100) · USA, operational · 2.36 PFlop/s
- CRIEPI HPE Cray XD225v · Japan, operational · 2.37 PFlop/s
- Plasma Simulator FX100 · Japan, decommissioned · 2.38 PFlop/s
Related systems
Same operator
- BlueBEAR · United Kingdom, operational
Same accelerator
- ABCI 2.0 · Japan, operational, 2021
- AlphaCentauri · Germany, operational, 2021
- Athena · Poland, operational, 2021
- Berzelius · Sweden, operational, 2021
- Earth Simulator 4 · Japan, operational, 2021
- Hortense · Belgium, operational, 2021
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| blog.bham.ac.uk | names system, part and count | NVIDIA A100 SXM4 40GB, Direct liquid cooling, warm water · counts: 184 |
| top500.org | names system and part | NVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect