COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Baskerville

United Kingdom · decommissioned · mixed

Baskerville

Also known as Baskerville Tier 2

Operated by University of Birmingham at University of Birmingham (Baskerville) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.34 PFlop/s
HPL measured
Rpeak
4.34 PFlop/s
Rmax ÷ Rpeak
53.9%
Cores
26,208
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Baskerville, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax2.34 PFlop/s#178 of 210 · bottom 16%#13 of 44 · top 28%
Rmax ÷ Rpeak53.9 %#184 of 207 · bottom 12%#38 of 44 · bottom 15%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo ThinkSystem nodes (TOP500 lists SR670 V2), with OCF as technology partner
Lenovo - Reported top500.orgblog.bham.ac.uk
Accelerator NVIDIA A100 SXM4 40GB
Accelerators
CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W
184 NVIDIA A100 GPUs on HGX quad boards (46 nodes x 4)
NVIDIA 184
reported
Reported blog.bham.ac.uk
CPU -
Intel Xeon Platinum 8360Y 36C 2.4GHz (Ice Lake)
Intel - Reported top500.org
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Infiniband HDR
NVIDIA - Reported top500.org
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
Lenovo Neptune direct-to-node warm water cooling
Lenovo - Reported blog.bham.ac.uk

Engineering, funding and access

What Baskerville runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Storage capacity5.5 PB5 PB of spinning disk plus 0.5 PB of flash = 5.5 PB2021-09Operator statedblog.bham.ac.uk
Cooling designLenovo Neptune direct-to-node warm-water cooling; each A100 GPU draws 400 W and a single rack has a potential draw of 76 kW2021-09Operator statedblog.bham.ac.uk

Software

ItemDetailAs ofBasisSource
Programming and software stackSoftware built with EasyBuild, reusing tooling developed for the University's BlueBEAR service2021-09Operator statedblog.bham.ac.uk

Funding

ItemDetailAs ofBasisSource
Funded byEngineering and Physical Sciences Research Council (EPSRC), part of UK Research and Innovation2021-09Operator statedbaskerville.ac.ukblog.bham.ac.uk
Funding programmeEPSRC Tier 2 HPC and World Class Labs initiativesThe September 2026 BEAR blog says the Tier 2 system's funding ended in March 20262021-09Operator statedblog.bham.ac.ukblog.bham.ac.uk
ProcurementBuilt with technology partners OCF, Lenovo, NVIDIA and Intel; Birmingham says it was the first UK site to install NVIDIA HGX boards carrying four A100 GPUs2021-09Operator statedblog.bham.ac.uk

Access

ItemDetailAs ofBasisSource
How researchers get timeEPSRC Access to HPC allocations for UK researchers, alongside pilot users and University of Birmingham usersAt launch, pilot users and Access to HPC researchers, including a group at Imperial College London, were on the system2021-09Operator statedblog.bham.ac.uk

The read

EPSRC-funded Tier 2 accelerated computing facility at the University of Birmingham, built with the Rosalind Franklin Institute, the Alan Turing Institute and Diamond Light Source. Birmingham's launch post (14 September 2021) describes 184 NVIDIA A100 GPUs on NVIDIA HGX quad boards with Intel Ice Lake CPUs, Lenovo Neptune warm-water direct-to-node cooling, and 5 PB of disk plus 0.5 PB of flash; funding was agreed in October 2020 and pilot users started in June 2021. TOP500 lists it as a Lenovo ThinkSystem with Xeon Platinum 8360Y 36C and A100 over InfiniBand HDR, 26,208 cores, Rmax 2.34 PFlop/s and Rpeak 4.34 PFlop/s; it ranked 445th on the June 2024 list and 490th on the November 2024 list. Baskerville's current hardware page also lists a newer B200 partition, which is not counted here. The University of Birmingham's BEAR blog (https://blog.bham.ac.uk/bear/2026/09/08/bear-infrastructure-improvements-in-2026/) says Baskerville was decommissioned after its funding came to an end in March 2026.

Timeline

  • 2020-10 Announced source
  • 2021-04 Early-ship Baskerville compute systems arrived at the University of Birmingham source
  • 2021-09 First operational source
  • 2024-06 Listed at #445 on the TOP500 (June 2024) source
  • 2026 Birmingham's research computing team decommissioned the Baskerville Tier 2 system after its funding came to an end in March 2026 source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

University of Birmingham (Baskerville)

Location
Birmingham, United Kingdom
Cooling
Direct liquid cooling, warm water
Commissioned
2021

Change history

Nearby in scale

The machines closest to Baskerville by Rmax, smaller to larger.

Same operator

  • BlueBEAR · United Kingdom, operational

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
blog.bham.ac.uknames system, part and countNVIDIA A100 SXM4 40GB, Direct liquid cooling, warm water · counts: 184
top500.orgnames system and partNVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.