Supercomputers/Systems/Thunderbird
USA · decommissioned · hpc
Thunderbird
Also known as Sandia Thunderbird Linux cluster
Operated by Sandia National Laboratories at Sandia National Laboratories, Albuquerque .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 46.40 TFlop/s
- Rpeak
- 57.60 TFlop/s
- Rmax ÷ Rpeak
- 80.6%
- Cores
- 8,000
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Thunderbird, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 46.40 TFlop/s | #17 of 74 · top 22% | #268 of 332 · bottom 20% |
| Rmax ÷ Rpeak | 80.6 % | #22 of 74 · top 29% | #101 of 331 · top 30% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge 1850 servers, 4,096 nodes at delivery | Dell Technologies | - | Reported | sandia.govtop500.org |
| CPU | - Intel EM64T Xeon 3.6 GHz, two per node | Intel | - | Reported | sandia.govtop500.org |
| Interconnect | - Cisco InfiniBand interconnect | Cisco | - | Reported | sandia.govtop500.org |
Engineering, funding and access
What Thunderbird runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 4,096 nodesDell PowerEdge 1850 servers with two Intel EM64T processors each, as purchased in 2005 | 2005-07 | Operator stated | sandia.gov |
| Total memory | 24 TBApproximately 24 TB aggregate | 2005-07 | Operator stated | sandia.gov |
| Interconnect and topology | Cisco InfiniBand, with Force10 E-Series switch/routers for Ethernet I/O and command and controlTOP500 lists InfiniBand | 2005-07 | Operator stated | sandia.govtop500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Purchased from Dell and installed with Dell Professional Services and Albuquerque's Technology Integration Group; delivery due by the end of July 2005 and full operation expected in early October 2005Sandia's second institutionally maintained capacity cluster | 2005-07 | Operator stated | sandia.gov |
The read
Sandia's institutional capacity cluster of Dell PowerEdge 1850 servers with dual 3.6 GHz Intel EM64T processors on a Cisco InfiniBand fabric, installed at the Central Computing Facility in Albuquerque in 2005. Sandia's lab news describes a 4,096-node system with over 8,000 processors, delivered by the end of July 2005, and a later Sandia release describes 4,480 servers reaching 53 TFLOPS and sixth place in November 2006. TOP500 lists it fifth on the November 2005 list at 46.4 TFLOPS Rmax with 8,000 cores; the figures here are that first entry. No retirement date was found. TOP500 and Sandia agree on the hardware but only TOP500 gives the Rmax, so the tier is reported.
Timeline
- 2005 First operational source
- 2005-07-08 Sandia announced its purchase of the 4,096-node Dell PowerEdge 1850 cluster with a Cisco InfiniBand interconnect source
- 2005-11 Listed at #5 on the TOP500 (November 2005) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Sandia National Laboratories, Albuquerque
- Location
- Albuquerque, NM, USA
- Cooling
- Chilled water
- Commissioned
- 1990
Change history
- 2026-10-02 Added Thunderbird, Sandia's Dell InfiniBand cluster
Nearby in scale
The machines closest to Thunderbird by Rmax, smaller to larger.
- Akka · Sweden, decommissioned · 0.05 PFlop/s
- QPACE (Wuppertal) · Germany, operational · 0.04 PFlop/s
- QPACE (Julich) · Germany, operational · 0.04 PFlop/s
- Neolith · Sweden, operational · 0.05 PFlop/s
- Chebyshev · Russia, operational · 0.05 PFlop/s
- TCS (SciNet) · Canada, decommissioned · 0.05 PFlop/s
Related systems
Same site
- Red Storm · USA, decommissioned, 2005
- Red Sky · USA, decommissioned, 2010
- ASCI Red · USA, decommissioned, 1997
- Sky Bridge · USA, decommissioned, 2015
- Intel Paragon XP/S 140 · USA, decommissioned, 1993
- El Dorado · USA, operational, 2024
Same operator
- Chama · USA, operational, 2011
- Cplant Siberia · USA, decommissioned, 1999
- Pecos · USA, operational, 2012
- Cayenne (Sandia) · USA, operational, 2017
- Serrano (Sandia) · USA, operational, 2017
- Astra · USA, operational, 2018
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system only | - |
| sandia.gov | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.