Supercomputers/Systems/Meta Lebanon (Indiana)

USA · under construction · ai training

Meta Lebanon (Indiana)

Also known as Meta Lebanon AI data center

Operated by Meta Platforms at Meta Lebanon AI Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Meta designs, builds and operates the 1 GW Lebanon, Indiana AI data center with closed-loop liquid cooling
Meta Platforms - Reported about.fb.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 10 USD bn 2026-02 Operator stated Meta: over $10 bn in infrastructure and community investment for the 1 GW Lebanon campus; floor value about.fb.com
Facility power 1,000 MW 2026-02 Design target Meta: "1GW of capacity once operational" at the Lebanon, Indiana campus; planned capacity, IT vs facility split not stated about.fb.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Grid Wabash Valley Power Alliance - planned 2026-10 Operator stated Meta worked with Wabash Valley Power Alliance and Boone REMC to plan energy for the 1 GW campus; no MW of supply stated. datacenters.atmeta.comabout.fb.com
Grid Boone REMC - planned 2026-10 Operator stated Distribution co-op, called Boone Power in the info sheet, named alongside Wabash Valley Power Alliance for the Lebanon campus; no MW stated. datacenters.atmeta.comabout.fb.com
Wind and solar - 409 contracted 2026-10 Operator stated Meta says four Indiana projects it supports add 409 MW of new clean energy to the grid. Used to match its electricity use; not a direct supply to the site. datacenters.atmeta.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

Meta's 1 GW AI data center campus in Lebanon, Boone County, Indiana, its second Indiana site, announced at groundbreaking on 11 February 2026 with more than 10 billion dollars of investment, a water-efficient closed-loop liquid-cooled design and about 4,000 construction jobs at peak. Meta does not give an operational date or hardware; trade coverage gives late 2027 or early 2028 for full operation, which is not recorded as a fact here. The only fetched source is Meta's own announcement, so the tier is reported.

Timeline

Site & facility

Meta Lebanon AI Campus

Location
Lebanon, IN, USA
Cooling
Closed-loop liquid cooling

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
about.fb.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.