Supercomputers/Systems/Hyundai Motor Group Blackwell AI Factory
South Korea · planned · ai training
Hyundai Motor Group Blackwell AI Factory
Also known as Hyundai Motor Group NVIDIA AI Factory
Operated by Hyundai Motor Group .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | - 50,000 NVIDIA Blackwell GPUs | NVIDIA | 50,000 reported | Verified | hyundaimotorgroup.comnvidianews.nvidia.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 50,000 accelerators | 2025-10 | Design target | 50,000 NVIDIA Blackwell GPUs planned for Hyundai Motor Group's AI factory, announced at APEC 31 Oct 2025. | blogs.nvidia.com |
Compute deals
- 2025-10-30: Hyundai Motor Group and NVIDIA (chip supply ). nvidianews.nvidia.comkoreatimes.co.kr
All compute deals. Headline values are as announced, not additive.
The read
Hyundai Motor Group and NVIDIA announced on 30-31 October 2025 (APEC Summit, Gyeongju) an AI factory built on 50,000 NVIDIA Blackwell GPUs for AI model training, validation and deployment across autonomous driving, smart factories, robotics and in-vehicle AI, alongside a Physical AI Application Center, an NVIDIA AI Technology Center and physical-AI data centers, as part of roughly 3 billion USD of joint investment in Korea. Both Hyundai and NVIDIA state the 50,000 Blackwell GPU figure. The platform mix (DGX for training; RTX PRO 6000 Blackwell Server Edition for Omniverse and Cosmos) is described but the split of the 50,000 GPUs is not. No site, delivery schedule, GPU SKU or FLOPS figure is published, so status is planned and site is left blank; no progress update was found as of this row's status_as_of.
Timeline
- 2025-10-31 Announced source
Change history
- 2026-10-04 Added AI datacenter metrics for hyundai-blackwell-ai-factory
- 2026-10-01 Added Hyundai Motor Group Blackwell AI Factory (Hyundai Motor Group)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| nvidianews.nvidia.com | names system only | - |
| hyundaimotorgroup.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.