Supercomputers/Systems/Tenaya
USA · operational · hpc
Tenaya
Also known as LLNL Tenaya
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.41 PFlop/s
- Rpeak
- 4.37 PFlop/s
- Rmax ÷ Rpeak
- 78.0%
- Cores
- 22,656
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tenaya, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.41 PFlop/s | #184 of 246 · bottom 26% | #104 of 332 · top 31% |
| Rmax ÷ Rpeak | 78.0 % | #78 of 243 · top 32% | #135 of 331 · top 41% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX, ATS-4 early access system | Hewlett Packard Enterprise | - | Verified | hpc.llnl.govtop500.org |
| Accelerator | AMD Instinct MI250X Accelerators ROCm (CDNA 2) · 1.7 GHz · TSMC N6 · 560 W AMD Instinct MI250X, 8 GPU devices per compute node per LLNL (96 in total) | AMD | - | Verified | hpc.llnl.govtop500.org |
| CPU | AMD EPYC 7A53 (Trento) CPUs x86-64 · 64C · 2 GHz · 7 nm · 280 W AMD Trento, 64 cores per node (TOP500: AMD Optimized 3rd Generation EPYC 64C 2GHz) | AMD | - | Reported | hpc.llnl.govtop500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds HPE Slingshot 11 | Hewlett Packard Enterprise | - | Verified | hpc.llnl.govtop500.org |
| Operating system | Tri-Lab Operating System Stack Operating systems Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained TOSS 4 | Lawrence Livermore National Laboratory | - | Verified | hpc.llnl.govtop500.org |
Engineering, funding and access
What Tenaya runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | HPE Slingshot 11 | 2026 | Operator stated | hpc.llnl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Job scheduler | Flux, node-scheduled main batch queue | 2026 | Operator stated | hpc.llnl.gov |
| Programming and software stack | g++ 7.5, hipcc 5.0.2 and HPE Cray MPI (HPL run)TOP500 list entry | 2026-06 | Operator stated | top500.org |
| Programming and software stack | TOSS 4 operating system | 2026 | Operator stated | hpc.llnl.gov |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | ASC program (CORAL-2 and ATS-4/EA class)Listed by LLNL as an El Capitan early-access system in the SCF zone | 2026 | Operator stated | hpc.llnl.gov |
The read
An early-access system for El Capitan in Livermore's Secure Computing Facility: an HPE Cray EX cluster of AMD Trento CPUs and AMD Instinct MI250X GPUs on Slingshot-11 under TOSS 4 and the Flux scheduler. TOP500 lists 22,656 cores, Rmax 3.41 and Rpeak 4.37 PFlop/s, first appearing 200th in June 2022 and listed 391st in June 2026. LLNL's platform page gives 24 nodes (2 login, 22 debug), 1,536 CPU cores, 96 GPU devices at 8 per compute node, 4.368 PFlop/s combined peak, ATS-4/EA and CORAL-2 class under the ASC programme, commissioned 2022; the two sources agree on peak.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-10-04 Added Tenaya (llnl)
Nearby in scale
The machines closest to Tenaya by Rmax, smaller to larger.
- SEAS H100 (Harvard) · USA, operational · 3.38 PFlop/s
- ASPIRE 2A (GPU Partition) · Singapore, operational · 3.33 PFlop/s
- SEIRAN · Japan, operational · 3.32 PFlop/s
- davinci-1 · Italy, operational · 3.45 PFlop/s
- CARO · Germany, operational · 3.46 PFlop/s
- Ohtaka · Japan, operational · 3.49 PFlop/s
Related systems
Same site
- rzVernal · USA, operational, 2022
- Tioga · USA, operational, 2022
- Bengal · USA, operational, 2023
- Dane · USA, operational, 2023
- RZHound · USA, operational, 2023
- El Capitan · USA, operational, 2024
Same operator
- Magma (LLNL) · USA, operational, 2020
- Ruby (LLNL) · USA, operational, 2020
- rzAdams · USA, operational, 2024
- Corona · USA, operational, 2019
- Matrix · USA, operational, 2025
- Tuolumne · USA, operational, 2025
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | names system and part | Tri-Lab Operating System Stack |
| top500.org | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Slingshot-11 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.