COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/SQUID

Japan · operational · hpc

SQUID

Operated by D3 Center, Osaka University at Osaka University D3 Center (SQUID) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
6.11 PFlop/s
HPL measured
Rpeak
8.87 PFlop/s
Rmax ÷ Rpeak
68.9%
Cores
115,520
Power
1.22 MW
Per watt
5.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of SQUID, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax6.11 PFlop/s#97 of 210 · top 46%#34 of 131 · top 25%
Energy efficiency5.0 GF/W#83 of 109 · bottom 25%#33 of 74 · top 44%
Rmax ÷ Rpeak68.9 %#116 of 207 · bottom 45%#84 of 130 · bottom 37%
Power draw1,222 kW#33 of 112 · top 29%#21 of 74 · top 27%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
NEC
NEC - Verified nec.comtop500.org
Accelerator NVIDIA A100 SXM4 40GB
Accelerators
CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W
42 nodes of eight NVIDIA A100 SXM4 40GB
NVIDIA 336
estimated
Verified hpc.cmc.osaka-u.ac.jpnec.com
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Mellanox InfiniBand HDR 200 Gbps
NVIDIA - Verified hpc.cmc.osaka-u.ac.jpnec.com
Storage DDN EXAScaler
Storage
Lustre appliance
DDN EXAScaler Lustre, 20 PB HDD and 1.2 PB NVMe
DDN
- Verified hpc.cmc.osaka-u.ac.jpnec.com
Operating system CentOS
Operating systems
Linux distribution, RHEL-compatible rebuild · Open source, community-maintained
CentOS
The CentOS Project
IBMNYSE rolls up to IBM
- Reported top500.org

Engineering, funding and access

What SQUID runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyInfiniBand HDR200CPU node subsystem (NEC LX 103Bj-8 with Xeon Platinum 8368)2026-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackCentOS operating system2026-06Operator statedtop500.org
Programming and software stackIntel Parallel Studio 2019, Intel MKL 2020.4 and Intel MPI 2020.4 (HPL run configuration)2026-06Operator statedtop500.org

The read

Osaka University's NEC system of 1,520 Xeon Ice Lake nodes, 42 nodes of eight NVIDIA A100 and 36 nodes of NEC vector engines on HDR InfiniBand, in service from May 2021 (the D3 centre's page gives both 1 and 6 May; NEC says May). TOP500's row covers the CPU nodes only, 67th in June 2021, while the whole system peaks at 16.6 PFlop/s per the centre, so the figures here are the CPU partition's. The city is not stated, so no coordinates are recorded. Service is scheduled to end in June 2027.

Timeline

  • 2020-12 Announced source
  • 2021-05 First operational source
  • 2021-06 Listed at #67 on the TOP500 (June 2021) source
  • 2021-06 SQUID CPU nodes debuted at rank 67 on the June 2021 TOP500 at 6.11 PFlop/s, falling to rank 267 by June 2026. source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Where sources disagree

We record conflicts instead of picking a winner quietly. All open questions.

Change history

Nearby in scale

The machines closest to SQUID by Rmax, smaller to larger.

  • Lockhart TDS · USA, operational · 6.06 PFlop/s
  • Lise · Germany, operational · 6.05 PFlop/s
  • DAIS · Germany, operational · 6.03 PFlop/s
  • JUWELS Cluster · Germany, operational · 6.18 PFlop/s
  • Genkai · Japan, operational · 6.22 PFlop/s
  • Onyx (ERDC) · USA, operational · 6.32 PFlop/s

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
nec.comnames system and partNVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR
top500.orgnames system and partNVIDIA InfiniBand HDR, CentOS

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading