Supercomputers/Systems/SQUID
Japan · operational · hpc
SQUID
Operated by D3 Center, Osaka University at Osaka University D3 Center (SQUID) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 6.11 PFlop/s
- Rpeak
- 8.87 PFlop/s
- Rmax ÷ Rpeak
- 68.9%
- Cores
- 115,520
- Power
- 1.22 MW
- Per watt
- 5.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of SQUID, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 6.11 PFlop/s | #97 of 210 · top 46% | #34 of 131 · top 25% |
| Energy efficiency | 5.0 GF/W | #83 of 109 · bottom 25% | #33 of 74 · top 44% |
| Rmax ÷ Rpeak | 68.9 % | #116 of 207 · bottom 45% | #84 of 130 · bottom 37% |
| Power draw | 1,222 kW | #33 of 112 · top 29% | #21 of 74 · top 27% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - NEC | NEC | - | Verified | nec.comtop500.org |
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W 42 nodes of eight NVIDIA A100 SXM4 40GB | NVIDIA | 336 estimated | Verified | hpc.cmc.osaka-u.ac.jpnec.com |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds Mellanox InfiniBand HDR 200 Gbps | NVIDIA | - | Verified | hpc.cmc.osaka-u.ac.jpnec.com |
| Storage | DDN EXAScaler Storage Lustre appliance DDN EXAScaler Lustre, 20 PB HDD and 1.2 PB NVMe | DDN | - | Verified | hpc.cmc.osaka-u.ac.jpnec.com |
| Operating system | CentOS Operating systems Linux distribution, RHEL-compatible rebuild · Open source, community-maintained CentOS | The CentOS Project | - | Reported | top500.org |
Engineering, funding and access
What SQUID runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand HDR200CPU node subsystem (NEC LX 103Bj-8 with Xeon Platinum 8368) | 2026-06 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | CentOS operating system | 2026-06 | Operator stated | top500.org |
| Programming and software stack | Intel Parallel Studio 2019, Intel MKL 2020.4 and Intel MPI 2020.4 (HPL run configuration) | 2026-06 | Operator stated | top500.org |
The read
Osaka University's NEC system of 1,520 Xeon Ice Lake nodes, 42 nodes of eight NVIDIA A100 and 36 nodes of NEC vector engines on HDR InfiniBand, in service from May 2021 (the D3 centre's page gives both 1 and 6 May; NEC says May). TOP500's row covers the CPU nodes only, 67th in June 2021, while the whole system peaks at 16.6 PFlop/s per the centre, so the figures here are the CPU partition's. The city is not stated, so no coordinates are recorded. Service is scheduled to end in June 2027.
Timeline
- 2020-12 Announced source
- 2021-05 First operational source
- 2021-06 Listed at #67 on the TOP500 (June 2021) source
- 2021-06 SQUID CPU nodes debuted at rank 67 on the June 2021 TOP500 at 6.11 PFlop/s, falling to rank 267 by June 2026. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Start of service: 1 May 2021 (D3 page) against 6 May 2021 (same page, news item). Only the month is recorded.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#159 on the 2025-06 list)
- 2026-09-20 Added; TOP500 lists only its CPU partition
Nearby in scale
The machines closest to SQUID by Rmax, smaller to larger.
- Lockhart TDS · USA, operational · 6.06 PFlop/s
- Lise · Germany, operational · 6.05 PFlop/s
- DAIS · Germany, operational · 6.03 PFlop/s
- JUWELS Cluster · Germany, operational · 6.18 PFlop/s
- Genkai · Japan, operational · 6.22 PFlop/s
- Onyx (ERDC) · USA, operational · 6.32 PFlop/s
Related systems
Same operator
- OCTOPUS · Japan, decommissioned, 2017
- Osaka SX-5/128M8 · Japan, operational, 2001
- Osaka SX-ACE · Japan, decommissioned
Same accelerator
- ABCI 2.0 · Japan, operational, 2021
- AlphaCentauri · Germany, operational, 2021
- Athena · Poland, operational, 2021
- Baskerville · United Kingdom, decommissioned, 2021
- Berzelius · Sweden, operational, 2021
- Earth Simulator 4 · Japan, operational, 2021
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| nec.com | names system and part | NVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR |
| top500.org | names system and part | NVIDIA InfiniBand HDR, CentOS |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.