COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Cambridge-1

United Kingdom · operational · ai training

Cambridge-1

Also known as NVIDIA Cambridge-1 DGX SuperPOD

Operated by NVIDIA at Kao Data Harlow Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
9.68 PFlop/s
HPL measured
Rpeak
12.05 PFlop/s
Rmax ÷ Rpeak
80.3%
Cores
79,360
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
NVIDIA DGX SuperPOD reference architecture, 80 DGX A100 systems
NVIDIA 80
reported
Verified nvidianews.nvidia.comcomputerweekly.com
Accelerator NVIDIA A100 (in DGX A100)
Accelerators
640 NVIDIA A100 GPUs in 80 DGX A100 systems
NVIDIA 640
reported
Reported nvidianews.nvidia.comtop500.org
CPU AMD EPYC 7742 (Rome)
CPUs
x86-64 · 64C · 2.25 GHz · 7 nm · 225 W
AMD EPYC 7742 64C 2.25GHz
AMD - Reported top500.org
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
NVIDIA Mellanox InfiniBand HDR
NVIDIA - Reported top500.orgnvidianews.nvidia.com

The read

NVIDIA's UK supercomputer for healthcare and life-science AI, an investment NVIDIA put at about 40 million pounds. NVIDIA's announcement and Computer Weekly both state 80 DGX A100 systems on Mellanox InfiniBand, which is 640 A100 GPUs at eight per system, and Computer Weekly places it at the Kao Data campus in Harlow and dates the switch-on to 7 July 2021. TOP500 (system 179960, first listed June 2021 at rank 41 and still listed at rank 194 in June 2026) reports 79,360 cores of AMD EPYC 7742 with A100 80 GB and InfiniBand HDR, 9.68 PFlop/s Rmax and 12.05 PFlop/s Rpeak; NVIDIA's own marketing figure was 8 PFlop/s. Partners named include GSK, AstraZeneca and King's College London.

Timeline

  • 2021-06 List debut at #41 (June 2021) source
  • 2021-07-07 First operational source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Kao Data Harlow Campus

Location
Harlow, United Kingdom
Commissioned
2021

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
nvidianews.nvidia.comnames system and partNVIDIA A100 (in DGX A100), NVIDIA InfiniBand HDR
computerweekly.comcould not be fetched-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading