COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Ohtaka

Japan · operational · hpc

Ohtaka

Operated by ISSP Supercomputer Center at ISSP Supercomputer Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
3.49 PFlop/s
HPL measured
Rpeak
5.12 PFlop/s
Rmax ÷ Rpeak
68.2%
Cores
215,040
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C6525 and R940
Dell Technologies - Reported top500.orgmdcl.issp.u-tokyo.ac.jp
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
HDR100 InfiniBand fat tree
NVIDIA - Reported mdcl.issp.u-tokyo.ac.jp
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.org

The read

The University of Tokyo's Institute for Solid State Physics system, Dell PowerEdge nodes with AMD EPYC 7702 CPUs and no accelerators on HDR100 InfiniBand, in service since October 2020 and 87th in November 2020. ISSP's page says the CPU node count was cut in July 2026. ISSP is the only source for the operator and dates, and the city is not stated, so no coordinates are recorded. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.

Timeline

  • 2020-10 First operational source
  • 2020-11 List debut at #87 (November 2020) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

ISSP Supercomputer Center

Location
Japan
Commissioned
2020

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
issp.u-tokyo.ac.jpnames system only-
top500.orgnames system and partNVIDIA InfiniBand HDR

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading