Supercomputers/Systems/DiRAC BlueGene/Q
United Kingdom · decommissioned · hpc
DiRAC BlueGene/Q
Also known as DiRAC Extreme Scaling Edinburgh BG/Q
Operated by EPCC at Advanced Computing Facility, Edinburgh .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.07 PFlop/s
- Rpeak
- 1.26 PFlop/s
- Rmax ÷ Rpeak
- 85.3%
- Cores
- 98,304
- Power
- 493.12 kW
- Per watt
- 2.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of DiRAC BlueGene/Q, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.07 PFlop/s | #35 of 193 · top 18% | #23 of 44 · bottom 50% |
| Energy efficiency | 2.2 GF/W | #15 of 149 · top 9% | #12 of 21 · bottom 46% |
| Rmax ÷ Rpeak | 85.3 % | #54 of 192 · top 28% | #10 of 44 · top 21% |
| Power draw | 493 kW | #73 of 151 · top 48% | #12 of 21 · bottom 46% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM Blue Gene/Q, six racks | IBM | - | Verified | top500.orgpos.sissa.it |
| CPU | IBM PowerPC A2 (Power BQC) CPUs PowerPC A2 · 18C · 1.6 GHz · 45 nm · 55 W Power BQC 16C 1.6GHz, 98,304 cores | IBM | - | Reported | top500.org |
| Interconnect | IBM BlueGene/Q 5D torus Interconnect 5D torus · 2 GB/s per link per direction Custom Blue Gene/Q interconnect | IBM | - | Reported | top500.org |
Engineering, funding and access
What DiRAC BlueGene/Q runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 6,144 nodesDerived: six racks of 1,024 nodes (98,304 cores at 16 per node); Boyle's Lattice 2012 paper describes the 1.26 PFlop/s six-rack Edinburgh system | 2012-06 | Operator stated | pos.sissa.it |
| Interconnect and topology | BlueGene/Q 5D torus on the compute chip: copper links inside each 512-node midplane, optical links between midplanes and 2 GB/s send plus 2 GB/s receive per link; I/O nodes reach external disk over InfiniBand | 2012-06 | Operator stated | pos.sissa.it |
| Cooling design | Water cooling, required by a rack density of about 100 kW per 1,024-node, 209.7 TFlop/s rack; the I/O nodes are air cooled | 2012-06 | Operator stated | pos.sissa.it |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Lean custom compute-node kernel with standard GNU compilers and libraries; Linux on the I/O nodes | 2012-06 | Operator stated | pos.sissa.it |
The read
Six-rack IBM Blue Gene/Q run by EPCC for the STFC DiRAC facility, 20th on the June 2012 TOP500 and used for lattice QCD and other extreme-scaling work. TOP500 lists 98,304 Power BQC 16-core 1.6 GHz cores, 1.073 PFlop/s Rmax and 1.258 PFlop/s Rpeak, and a Peter Boyle paper in the PoS proceedings describes the Edinburgh BlueGene/Q DiRAC system as 1.26 PFlop/s in six racks. EPCC's article on Tesseract says the DiRAC BlueGene/Q service was retired in January 2018 and succeeded in March 2018 by the 844-node Extreme Scaling system Tesseract.
Timeline
- 2012 First operational source
- 2012-06 Listed at #20 on the TOP500 (June 2012) source
- 2018-01 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Advanced Computing Facility, Edinburgh
- Location
- Edinburgh, United Kingdom
- Cooling
- Direct liquid cooling
- Commissioned
- 1990
Change history
- 2026-10-02 Added DiRAC BlueGene/Q, Edinburgh
Nearby in scale
The machines closest to DiRAC BlueGene/Q by Rmax, smaller to larger.
- Turing (IDRIS) · France, decommissioned · 1.07 PFlop/s
- BeBop · USA, operational · 1.07 PFlop/s
- Shoubu System B · Japan, operational · 1.06 PFlop/s
- INL Falcon · USA, decommissioned · 1.09 PFlop/s
- Cartesius · Netherlands, decommissioned · 1.09 PFlop/s
- Magnus · Australia, decommissioned · 1.1 PFlop/s
Related systems
Same site
- ARCHER · United Kingdom, decommissioned, 2013
- HECToR · United Kingdom, decommissioned, 2007
- ARCHER2 · United Kingdom, operational, 2021
- Tursa · United Kingdom, operational, 2021
- UK Next National Supercomputer · United Kingdom, under construction
Same operator
- EPCC Cerebras CS-2 Cluster · United Kingdom, operational, 2022
- HPCx · United Kingdom, decommissioned, 2002
- Cirrus · United Kingdom, operational, 2025
- Edinburgh Cray T3E900 · United Kingdom, operational, 1997
- Edinburgh Cray T3D (Typhoon) · United Kingdom, operational, 1994
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| pos.sissa.it | does not name this system | - |
| top500.org | names system and part | IBM BlueGene/Q 5D torus |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.