Compute·Atlas

Supercomputers/Systems/CM-5/1024

USA · decommissioned · hpc

CM-5/1024

Also known as Connection Machine 5

Operated by Los Alamos National Laboratory at Los Alamos Strategic Computing Complex.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Measured performance

Rmax
59.7 GFlop/s
HPL measured
Rpeak
131.0 GFlop/s
Rmax ÷ Rpeak
45.6%
Cores
1,024
Power
Per watt
GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator
Thinking Machines Corporation
Thinking Machines
Reported computerhistory.org
CPU Thinking Machines CM-5 vector node
CPUs
CM-5/1024
Thinking Machines
1,024
reported
Reported computerhistory.org
Interconnect Thinking Machines CM-5 fat tree
Interconnect
CM-5 fat tree data network
Thinking Machines
Reported computerhistory.org

The read

The machine at the top of the first published HPL list, and the cleanest illustration of why entity resolution is the hard part of this dataset. Thinking Machines Corporation filed for bankruptcy the following year. There is no surviving corporate parent to attribute the supply chain to — the vendor row simply terminates. Every analysis on this site that rolls installed base up to present-day tickers has to decide what to do with rows like this one, and we resolve it by keeping the historical vendor as a first-class entity with status `defunct` rather than folding it into a successor that does not exist.

Timeline

  • 1991 Announced source
  • 1993-06 List debut at #1 (June 1993) source
  • 1993-06 First operational source

Public list appearances

Pointers only — rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Los Alamos Strategic Computing Complex

Location
Los Alamos, NM, USA
Cooling
Chilled water
Commissioned
1993